Answered step by step
Verified Expert Solution
Link Copied!
Question
1 Approved Answer

Making three questions from this problem statement. te cient provided analysis sheet and input project estimation information to determine if only one or both projects

Making three questions from this problem statement.
image text in transcribed
te cient provided analysis sheet and input project estimation information to determine if only one or both projects meet the required yield percentage for the client to proceed with construction Problem 1 Cost Analysis After purchasing two pieces of land for their proposed Building #1 and Building #2, the client is now asking you to assist them in understanding if the overall project cost will financially make sense given their projected Net Operating Income (profit) generated from the buildings. The client has provided you with information on their cost of purchasing land, estimations of various scopes, abatement, and other information in hopes of better understanding if they are able to achieve their 7.0% yield on the properties yearly. The client has asked you to fill out the cost analysis worksheet for their review and only want modifications to be made in cells that are highlighted in yellow so that they can consult with their third-party estimating consultant. Requirements: Fill out provided take off section of the provided cost worksheet do not modify lines or cell formats. If you a take off item you have does not fit in the provided sheet, it is not needed for analysis Fill out provided cost section of the Cost work sheet do not modify lines or cell formats. If information you have does not fit a category provided it the sheet it is not needed Components not listed on the provided sheet can be ignored. Do not add more lines or delete existing lines if unused. If lines don't have quantity, simply put zero as the quantity. Provide a one-page narrative informing high level take off and cost information to inform the client if their yield of 7.0% can be achieved for one or both projects General Notes Assume that wall painting square footage matches drywall wall square footage and that gypsum board celling cost includes paint Assume that Building #2 is 10% smaller in square footage than Building #1 Technical Notes Assume that you are only required to populate fields that are highlighted yellow For dimensions not provided, you are able to scale the provided PDF's Assume that for this exercise the only takeoffs that will be needed are for doors, ceilings, and flooring Supplemental Information For Building #1 olinnt with an estimate of $42 500,000 o o o 0 0 0 te cient provided analysis sheet and input project estimation information to determine if only one or both projects meet the required yield percentage for the client to proceed with construction Problem 1 Cost Analysis After purchasing two pieces of land for their proposed Building #1 and Building #2, the client is now asking you to assist them in understanding if the overall project cost will financially make sense given their projected Net Operating Income (profit) generated from the buildings. The client has provided you with information on their cost of purchasing land, estimations of various scopes, abatement, and other information in hopes of better understanding if they are able to achieve their 7.0% yield on the properties yearly. The client has asked you to fill out the cost analysis worksheet for their review and only want modifications to be made in cells that are highlighted in yellow so that they can consult with their third-party estimating consultant. Requirements: Fill out provided take off section of the provided cost worksheet do not modify lines or cell formats. If you a take off item you have does not fit in the provided sheet, it is not needed for analysis Fill out provided cost section of the Cost work sheet do not modify lines or cell formats. If information you have does not fit a category provided it the sheet it is not needed Components not listed on the provided sheet can be ignored. Do not add more lines or delete existing lines if unused. If lines don't have quantity, simply put zero as the quantity. Provide a one-page narrative informing high level take off and cost information to inform the client if their yield of 7.0% can be achieved for one or both projects General Notes Assume that wall painting square footage matches drywall wall square footage and that gypsum board celling cost includes paint Assume that Building #2 is 10% smaller in square footage than Building #1 Technical Notes Assume that you are only required to populate fields that are highlighted yellow For dimensions not provided, you are able to scale the provided PDF's Assume that for this exercise the only takeoffs that will be needed are for doors, ceilings, and flooring Supplemental Information For Building #1 olinnt with an estimate of $42 500,000 o o o 0 0 0

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image
Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Connect For Computer Accounting With Quickbooks 2021

Authors: Author

20th Edition

1264069200, 9781264069200

More Books

Students explore these related Accounting questions

Question

2.5 Describe a social audit.

Answered: 3 weeks ago