Answered step by step
Verified Expert Solution
Link Copied!

Question

...
1 Approved Answer

Manchester Technology, Inc., manufactures several different types of printed circuit boards; however, two of the boards account for the majority of the companys sales. The

Manchester Technology, Inc., manufactures several different types of printed circuit boards; however, two of the boards account for the majority of the companys sales. The first of these boards, a television circuit board, has been a standard in the industry for several years. The market for this type of board is competitive and price-sensitive. Manchester plans to sell 79,000 of the TV boards in 20x1 at a price of $450 per unit. The second high-volume product, a personal computer circuit board, is a recent addition to Manchesters product line. Because the PC board incorporates the latest technology, it can be sold at a premium price. The 20x1 plans include the sale of 54,000 PC boards at $785 per unit. Manchesters management group is meeting to discuss how to spend the sales and promotion dollars for 20x1. The sales manager believes that the market share for the TV board could be expanded by concentrating Manchesters promotional efforts in this area. In response to this suggestion, the production manager said, Why dont you go after a bigger market for the PC board? The cost sheets that I get show that the contribution from a PC board is significantly larger than the contribution from a TV board. I know we get a premium price for the PC board. Selling it should help overall profitability. The cost-accounting system shows that the following costs apply to the PC and TV boards.

PC Board TV Board

Direct Material $243 $153

Material Labor 3.5 hr. 1.5 hr.

Machine Time 1.5 hr. 1.5 hr.

Variable manufacturing overhead is applied on the basis of direct-labor hours. For 20x1, variable overhead is budgeted at $2,450,000, and direct-labor hours are estimated at 322,875. The hourly rates for machine time and direct labor are $26 and $34, respectively. The company applies a material-handling charge at 10 percent of material cost. This material-handling charge is not included in variable manufacturing overhead. Total 20x1 expenditures for direct material are budgeted at $25,209,000. Andrew Fulton, Manchesters controller, believes that before the management group proceeds with the discussion about allocating sales and promotional dollars to individual products, it might be worthwhile to look at these products on the basis of the activities involved in their production. Fulton has prepared the following schedule to help the management group understand this concept. Using this information, Fulton explained, we can calculate an activity-based cost for each TV board and each PC board and then compare it to the standard cost we have been using. The only cost that remains the same for both cost methods is the cost of direct material. The cost drivers will replace the direct labor, machine time, and overhead costs in the old standard cost figures.

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed

00 8 Manchester Technology, Inc., manufactures several different types of printed circuit boards; however, two of the boards account for the majority of the company's sales. The first of these boards, a television circuit board, has been a standard in the industry for several years. The market for this type of board is competitive and price-sensitive. Manchester plans to sell 79,000 of the TV boards in 20x1 at a price of $450 per unit. The second high-volume product, a personal computer circuit board, is a recent addition to Manchester's product line. Because the PC board incorporates the latest technology, it can be sold at a premium price. The 20x1 plans include the sale of 54,000 PC boards at $785 per unit. 6.25 points eBook Manchester's management group is meeting to discuss how to spend the sales and promotion dollars for 20x1. The sales manager believes that the market share for the TV board could be expanded by concentrating Manchester's promotional efforts in this area. In response to this suggestion, the production manager said, "Why don't you go after a bigger market for the PC board? The cost sheets that I get show that the contribution from a PC board is significantly larger than the contribution from a TV board. I know we get a premium price for the PC board. Selling it should help overall profitability." The cost-accounting system shows that the following costs apply to the PC and TV boards. References Direct material Direct labor Machine time PC Board TV Board $243 $153 3.5 hr. 1.5 hr. 1.5 hr. 1.5 hr. Variable manufacturing overhead is applied on the basis of direct-labor hours. For 20x1, variable overhead is budgeted at $2,450,000, and direct-labor hours are estimated at 322,875. The hourly rates for machine time and direct labor are $26 and $34, respectively. The company applies a material handling charge at 10 percent of material cost. This material handling charge is not included in variable manufacturing overhead. Total 20x1 expenditures for direct material are budgeted at $25,209,000. Andrew Fulton, Manchester's controller, believes that before the management group proceeds with the discussion about allocating sales and promotional dollars to individual products, it might be worthwhile to look at these products on the basis of the activities involved in their production. Fulton has prepared the following schedule to help the management group understand this concept. "Using this information," Fulton explained, "we can calculate an activity-based cost for each TV board and each PC board and then compare it to the standard cost we have been using. The only cost that remains the same for both cost methods is the cost of direct material. The cost drivers will replace the direct labor, machine time, and overhead costs in the old standard cost figures." Cost Driver Number of parts Number of boards Number of boards Budgeted Annual Activity for cost Driver 7,914,000 parts 139,650 boards 139,650 boards Budgeted cost Procurement Production scheduling Packaging and shipping Total Machine setup Hazardous waste disposal Quality control General supplies Total Machine insertion Manual insertion Wave-soldering Total $ 940,000 510,000 1,020,000 $ 2,470,000 $ 948,000 124,800 1,284,000 174,000 $ 2,450,000 $ 3,100,000 7,914,000 334,000 $12,834,000 Number of setups Pounds of waste Number of inspections Number of boards 615,300 setups 50,337 pounds 475,650 inspections 139,650 boards Number of parts Number of parts Number of boards 5,658,000 parts 2,256,000 parts 139,650 boards 00 8 $ Cost Driver Number of parts Number of boards Number of boards Budgeted Annual Activity for Cost Driver 7,914,000 parts 139,650 boards 139,65e boards 6.25 points Budgeted cost Procurement Production scheduling Packaging and shipping Total Machine setup Hazardous waste disposal Quality control General supplies Total Machine insertion Manual insertion wave-soldering Total 940,000 510,000 1,020,000 $ 2,470,000 $ 948,800 124,000 1,204,000 174,000 $ 2,450,000 $ 3,100,000 7,914,000 334,000 $12,834,800 Number of setups Pounds of waste Number of inspections Number of boards 615,300 setups 50,337 pounds 475,650 inspections 139,650 boards eBook Number of parts Number of parts Number of boards 5,658,800 parts 2,256,800 parts 139,650 boards References Required per Unit Parts: Machine insertions Manual insertions Machine setups Hazardous waste disposal, in lb. Inspections PC Board 83 50 33 5 8.80 4 TV Board 40 39 1 4 0.06 3 Required: 1. Identify at least four general advantages associated with activity-based costing. 2. On the basis of Manchester's unit cost data given in the problem, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. 3. Using activity-based costing, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Identify at least four general advantages associated with activity-based costing. (Select "Yes" if the item is a general advantage, and "No" if it is not.) Allows management to focus on value-added and non-value-added activities, so that non-value-added activities can be controlled or eliminated, thus streamlining production processes. Highlights the relationship between activities and identifies opportunities to reduce costs (.e., designing products with fewer parts in order to reduce the cost of the manufacturing process). Provides management with reports that are easier to interpret because only one manufacturing-overhead cost pool is used per product Provides management with a more thorough understanding of complex product costs and product profitability for improved resource management and pricing decisions. Provides a more appropriate means of charging overhead costs to products. Requires less resources and is easier to implement than traditional costing systems. Required 1 Required 2 > 00 8 6.25 points eBook $ Andrew Fulton, Manchester's controller, believes that before the management group proceeds with the discussion about allocating sales and promotional dollars to individual products, it might be worthwhile to look at these products on the basis of the activities involved in their production. Fulton has prepared the following schedule to help the management group understand this concept. "Using this information," Fulton explained, "we can calculate an activity-based cost for each TV board and each PC board and then compare it to the standard cost we have been using. The only cost that remains the same for both cost methods is the cost of direct material. The cost drivers will replace the direct labor, machine time, and overhead costs in the old standard cost figures." Budgeted Annual Activity Budgeted cost Cost Driver for Cost Driver Procurement 940,000 Number of parts 7,914,000 parts Production scheduling 510,000 Number of boards 139,650 boards Packaging and shipping 1,020,000 Number of boards 139,650 boards Total $ 2,470,000 Machine setup 948,000 Number of setups 615,308 setups Hazardous waste disposal 124,000 Pounds of waste 50,337 pounds Quality control 1,204,800 Number of inspections 475,650 inspections General supplies 174,000 Number of boards 139,650 boards Total $ 2,450,000 Machine insertion $ 3,100,000 Number of parts 5,658,000 parts Manual insertion 7,914,800 Number of parts 2,256,200 parts wave-soldering 334,080 Number of boards 139,650 boards Total $12,834,000 References $ Required per Unit Parts: Machine insertions Manual insertions Machine setups Hazardous waste disposal, in lb. Inspections PC Board 83 50 33 5 8.80 4 TV Board 40 39 1 4 0.06 3 Hom Required: 1. Identify at least four general advantages associated with activity-based costing. 2. On the basis of Manchester's unit cost data given in the problem, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. 3. Using activity-based costing, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 On the basis of Manchester's unit cost data given in the problem, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. (Round your intermediate calculations to 2 decimal places.) PC Board TV Board Total contribution margin 00 8 Andrew Fulton, Manchester's controller, believes that before the management group proceeds with the discussion about allocating sales and promotional dollars to individual products, it might be worthwhile to look at these products on the basis of the activities involved in their production. Fulton has prepared the following schedule to help the management group understand this concept. "Using this information," Fulton explained, "we can calculate an activity-based cost for each TV board and each PC board and then compare it to the standard cost we have been using. The only cost that remains the same for both cost methods is the cost of direct material. The cost drivers will replace the direct labor, machine time, and overhead costs in the old standard cost figures." 6.25 points eBook Cost Driver Number of parts Number of boards Number of boards Budgeted Annual Activity for Cost Driver 7,914,000 parts 139,650 boards 139,650 boards References Budgeted cost Procurement Production scheduling Packaging and shipping Total Machine setup Hazardous waste disposal Quality control General supplies Total Machine insertion Manual insertion Wave-soldering Total $ 940,000 510,000 1,020,000 $ 2,470,000 $ 948,000 124,000 1,204,000 174,000 $ 2,450,000 $ 3,100,000 7,914,800 334,000 $12,834,000 Number of setups Pounds of waste Number of inspections Number of boards 615,300 setups 50,337 pounds 475,650 inspections 139,650 boards Number of parts Number of parts Number of boards 5,658,000 parts 2,256,080 parts 139,650 boards Required per Unit Parts: Machine insertions Manual insertions Machine setups Hazardous waste disposal, in lb. Inspections PC Board 83 50 33 5 8.80 4 TV Board 40 39 1 4 0.06 3 Required: 1. Identify at least four general advantages associated with activity-based costing. 2. On the basis of Manchester's unit cost data given in the problem, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. 3. Using activity-based costing, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Using activity-based costing, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. (Round your intermediate calculations to 2 decimal places.) PC Board TV Board Total contribution margin 00 8 6.25 points eBook $ Andrew Fulton, Manchester's controller, believes that before the management group proceeds with the discussion about allocating sales and promotional dollars to individual products, it might be worthwhile to look at these products on the basis of the activities involved in their production. Fulton has prepared the following schedule to help the management group understand this concept. "Using this information," Fulton explained, "we can calculate an activity-based cost for each TV board and each PC board and then compare it to the standard cost we have been using. The only cost that remains the same for both cost methods is the cost of direct material. The cost drivers will replace the direct labor, machine time, and overhead costs in the old standard cost figures." Budgeted Annual Activity Budgeted cost Cost Driver for Cost Driver Procurement 940,000 Number of parts 7,914,000 parts Production scheduling 510,000 Number of boards 139,650 boards Packaging and shipping 1,020,000 Number of boards 139,650 boards Total $ 2,470,000 Machine setup 948,000 Number of setups 615,308 setups Hazardous waste disposal 124,000 Pounds of waste 50,337 pounds Quality control 1,204,800 Number of inspections 475,650 inspections General supplies 174,000 Number of boards 139,650 boards Total $ 2,450,000 Machine insertion $ 3,100,000 Number of parts 5,658,000 parts Manual insertion 7,914,800 Number of parts 2,256,200 parts wave-soldering 334,080 Number of boards 139,650 boards Total $12,834,000 References $ Required per Unit Parts: Machine insertions Manual insertions Machine setups Hazardous waste disposal, in lb. Inspections PC Board 83 50 33 5 8.80 4 TV Board 40 39 1 4 0.06 3 Hom Required: 1. Identify at least four general advantages associated with activity-based costing. 2. On the basis of Manchester's unit cost data given in the problem, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. 3. Using activity-based costing, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 On the basis of Manchester's unit cost data given in the problem, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. (Round your intermediate calculations to 2 decimal places.) PC Board TV Board Total contribution margin 00 8 Andrew Fulton, Manchester's controller, believes that before the management group proceeds with the discussion about allocating sales and promotional dollars to individual products, it might be worthwhile to look at these products on the basis of the activities involved in their production. Fulton has prepared the following schedule to help the management group understand this concept. "Using this information," Fulton explained, "we can calculate an activity-based cost for each TV board and each PC board and then compare it to the standard cost we have been using. The only cost that remains the same for both cost methods is the cost of direct material. The cost drivers will replace the direct labor, machine time, and overhead costs in the old standard cost figures." 6.25 points eBook Cost Driver Number of parts Number of boards Number of boards Budgeted Annual Activity for Cost Driver 7,914,000 parts 139,650 boards 139,650 boards References Budgeted cost Procurement Production scheduling Packaging and shipping Total Machine setup Hazardous waste disposal Quality control General supplies Total Machine insertion Manual insertion Wave-soldering Total $ 940,000 510,000 1,020,000 $ 2,470,000 $ 948,000 124,000 1,204,000 174,000 $ 2,450,000 $ 3,100,000 7,914,800 334,000 $12,834,000 Number of setups Pounds of waste Number of inspections Number of boards 615,300 setups 50,337 pounds 475,650 inspections 139,650 boards Number of parts Number of parts Number of boards 5,658,000 parts 2,256,080 parts 139,650 boards Required per Unit Parts: Machine insertions Manual insertions Machine setups Hazardous waste disposal, in lb. Inspections PC Board 83 50 33 5 8.80 4 TV Board 40 39 1 4 0.06 3 Required: 1. Identify at least four general advantages associated with activity-based costing. 2. On the basis of Manchester's unit cost data given in the problem, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. 3. Using activity-based costing, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Using activity-based costing, calculate the total amount that each of the two product lines will contribute toward covering fixed costs and profit in 20x1. (Round your intermediate calculations to 2 decimal places.) PC Board TV Board Total contribution margin

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Cost Accounting

Authors: Edward B. Deakin, Michael Maher

3rd Edition

9780256069198

Students also viewed these Accounting questions