Manufacturing systems engineering. Please answer both questions. Thank You The table below shows the Net Requirements for Parif.Z. The lot sizing rule is the Silver-Meal

Manufacturing systems engineering. Please answer both questions. Thank You
image text in transcribed
image text in transcribed
The table below shows the Net Requirements for Parif.Z. The lot sizing rule is the Silver-Meal Heuristic. We know that the planned receipts for period 1 will include the net requirements for periods 2 and 3 . What is the minimum period 4 net requirements that will generate a new planned receipt batch for period 4 . Hint: Calculate the quantity such that that the period 3 and period 4 cost/period is the same. First place of decimal. Samsung will produce its new line of Bespoke refrigerators at its home appliance manufacturing facility in South Carolina. The annual demand for the refrigerators is 25,732 units and the holding cost is $36.7 /unit/ year. Sheet glass for the refrigerators will be supplied by Corning. Replenishment orders to the South Carolina plant will be supplied at the rate of 495 units/day and the order cost is $2,843 /order. What is the production order quantity (POQ)? 365 days/year. (Integer answer) The table below shows the Net Requirements for Parif.Z. The lot sizing rule is the Silver-Meal Heuristic. We know that the planned receipts for period 1 will include the net requirements for periods 2 and 3 . What is the minimum period 4 net requirements that will generate a new planned receipt batch for period 4 . Hint: Calculate the quantity such that that the period 3 and period 4 cost/period is the same. First place of decimal. Samsung will produce its new line of Bespoke refrigerators at its home appliance manufacturing facility in South Carolina. The annual demand for the refrigerators is 25,732 units and the holding cost is $36.7 /unit/ year. Sheet glass for the refrigerators will be supplied by Corning. Replenishment orders to the South Carolina plant will be supplied at the rate of 495 units/day and the order cost is $2,843 /order. What is the production order quantity (POQ)? 365 days/year. (Integer answer)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions