mapter #10 Homework Saved Hels Tombro Industries is in the process of automating one of its plants and developing a flexible manufacturing system. The company is finding it necessary to make many changes in operating procedures. Progress has been slow, particularly in trying to develop new performance measures for the factory. In an effort to evaluate performance and determine where improvements can be made, management has gathered the following data relating to activities over the last four months: ints Month eBook 173 134 40 95 106 37 68 Print 10 days 9 days 28 29 7 days 38 5 days Quality control measuresi Number of defects Number of warranty claims Number of customer complaints Material control measuresi Purchase order lead time Serap as a percent of total cost Machine performance measures: Machine downtine as a percentage of availability Use as a percentage of availability Setup time (hours) Delivery performance measures Throughput time Manufacturing cycle efficiency (MCE) Delivery cycle time Percentage of on-time deliveries eferences 958 92 85 10 966 958 The president has read in industry Journals that throughput time, MCE, and delivery cycle time are important measures of performance, but no one is sure how they are corputed. You have been asked to assist the company, and you have gathered the following data relating to these measures: Average per Month in days) wait time per order before start of production Inspection time per unit Process time per unit Queue time per unit Move time per unit 9.0 0.8 10.8 0.7 2.7 4.4 0.4 12.0 0.7 2.6 6.3 0.4 14.0 0.7 1.1 8.6 0.6 4.1 0.3 wter #10 Homework 6 Required: 1-a. Compute the throughput time for each month. 1-b. Compute the manufacturing cycle efficiency (MCE) for each month. 1-c. Compute the delivery cycle time for each month. 3-a. Refer to the inspection time, process time, and so forth, given for month 4. Assume that in month 5 the inspection time, process time, and so forth, are the same as for month 4, except that the company is able to completely eliminate the queue time during production using Lean Production Compute the new throughput time and MCE. 3-b. Refer to the inspection time, process time, and so forth, given for month 4. Assume that in month 6 the inspection time, process time, and so forth, are the same as in month 4, except that the company is able to eliminate both the queue time during production and the inspection time using Lean Production. Compute the new throughput time and MCE. Book Print Complete this question by entering your answers in the tabs below. rences Required 1 Required 3 1-a. Compute the throughput time for each month. 1.b. Compute the manufacturing cycle efficiency (MCE) for each month. 1-c. Compute the delivery cycle time for each month. (Round your answers to 1 decimal place.) Show less Throughput Time Manufacturing Cycle Delivery Cycle Time Efficiency (MCE) days days days Month 1 Month 2 Month 3 Month 4 days | days days Required 3 > ter #10 Homework Saved Required: 1-a. Compute the throughput time for each month. 1-b. Compute the manufacturing cycle efficiency (MCE) for each month. 1-c. Compute the delivery cycle time for each month. 3-a. Refer to the inspection time, process time, and so forth, given for month 4. Assume that in month 5 the inspection time, proc time, and so forth, are the same as for month 4, except that the company is able to completely eliminate the queue time during production using Lean Production. Compute the new throughput time and MCE. 3-b. Refer to the inspection time, process time, and so forth, given for month 4. Assume that in month 6 the inspection time, proc time, and so forth, are the same as in month 4, except that the company is able to eliminate both the queue time during producti and the inspection time using Lean Production. Compute the new throughput time and MCE. Ook Complete this question by entering your answers in the tabs below. ences Required 1 Required 3 3-a. (Month 5) Refer to the inspection time, process time, and so forth, given for month 4. Assume that in month 5 the inspection time, process time, and so forth, are the same as for month 4, except that the company is able to completely eliminate the queue time during production using Lean Production. Compute the new throughput time and MCE. 3-b. (Month 6) Refer to the inspection time, process time, and so forth, given for month 4. Assume that in month 6 the inspection time, process time, and so forth, are the same as in month 4, except that the company is able to eliminate both the queue time during production and the inspection time using Lean Production. Compute the new throughput time and MCE. (Round your answers to 1 decimal place.) Show less Month 5 days Month 6 Throughput time Manufacturing cycle efficiency (MCE)