Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Marconi Manufacturing produces two items in its Trumbull Plant: Tuff Stuff and Ruff Stuff. Since inception, Marconi has used only one manufacturing-overhead cost pool to
Marconi Manufacturing produces two items in its Trumbull Plant: Tuff Stuff and Ruff Stuff. Since inception, Marconi has used only one manufacturing-overhead cost pool to accumulate costs. Overhead has been allocated to products based on direct-labor hours. Until recently, Marconi was the sole producer of Ruff Stuff and was able to dictate the selling price. However, last year Marvella Products began marketing a comparable product at a price below the cost assigned by Marconi. Market share has declined rapidly, and Marconi must now decide whether to meet the competitive price or to discontinue the product line. Recognizing that discontinuing the product line would place an additional burden on its remaining product, Tuff Stuff, management is using activity-based costing to determine if it would show a different cost structure for the two products. The two major indirect costs for manufacturing the products are power usage and setup costs. Most of the power is used in fabricating the products' components, while most of the setup costs are required in assembling them. The setup costs are predominantly related to the Tuff Stuff product line. A decision was made to separate the Manufacturing Department costs into two activity cost pools as follows: Fabrication: machine hours will be the cost driver. Assembly: number of setups will be the cost driver. The controller has gathered the following information. Problem 5-59 Activity-Based Costing; Production and Pricing Decisions (LO 5-1, 5-2, 5-3, 5-4, 5-5) 1(b). Tuff Stuff unit cost: $28.00 3. Fabricating cost per unit, Tuff Stuff $4.93 per unit (rounded) MANUFACTURING DEPARTMENT Annual Budget before Separation of Overhead Number of units Direct-labor hours" Total direct-labor cost Direct material Budgeted overhead: Indirect labor Fringe benefits Indirect material Power Setup Quality assurance Other utilities Depreciation Total $800,000 $24,000 5,000 31,000 180,000 75,000 10,000 10,000 15,000 Product Line Tuff Stuff Ruff Stuff 20,000 20,000 2 hours per unit 3 hours per unit $5.00 per unit $3.00 per unit "Direct-labor hourly rate is the same in both departments. Chapter 5 Activity-Based Costing and Management Required: 1. Assigning overhead based on direct-labor hours, calculate the following: a. Total budgeted cost of the Manufacturing Department. b. Unit cost of Tuff Stuff and Ruff Stuff. 2. After separation of overhead into activity cost pools, compute the total budgeted cost of each activity: Fabrication and Assembly. 3. Using activity-based costing, calculate the unit costs for each product. (In computing the pool rates for the Fabrication and Assembly activity cost pools, round to the nearest cent. Then, in computing unit product costs, round to the nearest cent.) 4. Discuss how a decision regarding the production and pricing of Ruff Stuff will be affected by the results of your calculations in the preceding requirements
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started