Match the design risk term with the most appropriate description. Group of answer choices Poor quality or inadequate design, drawings, or specs Regulatory requiremetns in

Match the design risk term with the most appropriate description. Group of answer choices Poor quality or inadequate design, drawings, or specs Regulatory requiremetns in place at the beginning of the project may change during construction. Noncompliance with design standards Reviews and the approval process associated with design submittals take longer than typically allowed. Owner-directed changes The information and detail needed to construct an element of work is missing, incomplete, or inaccurate. Excessive design review by owner, architect, or agency The design doesn't meet the building code or other regulations. Changes in design standards or regulatory requirements. The owner changes their mind about the design after construction begins. Latent design effects affecting contractor's warranty. Defective design details that result in flawed construction after occupancy of the facility

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Managing Operations Across The Supply Chain

Authors: Morgan Swink, Steven Melnyk, Janet L. Hartley, M. Bixby Cooper

4th Edition

1260547639, 978-1260547634

More Books

Students also viewed these General Management questions

Question

What is a verb?

Answered: 1 week ago