Question
McCullough Hospital uses a job-order costing system to assign costs to its patients. Its direct materials include a variety of items such as pharmaceutical drugs,
McCullough Hospital uses a job-order costing system to assign costs to its patients. Its direct materials include a variety of items such as pharmaceutical drugs, heart valves, artificial hips, and pacemakers. Its direct labor costs (e.g., surgeons, anesthesiologists, radiologists, and nurses) associated with specific surgical procedures and tests are traced to individual patients. All other costs, such as depreciation of medical equipment, insurance, utilities, incidental medical supplies, and the labor costs associated with around-the clock monitoring of patients are treated as overhead costs.
Historically, McCullough has used one predetermined overhead rate based on the number of patient-days (each night that a patient spends in the hospital counts as one patient-day) to allocate overhead costs to patients. Recently a member of the hospitals accounting staff has suggested using two predetermined overhead rates (allocated based on the number of patient-days) to improve the accuracy of the costs allocated to patients. The first overhead rate would include all overhead costs within the Intensive Care Unit (ICU) and the second overhead rate would include all Other overhead costs. Information pertaining to the hospitals estimated number of patient-days, its estimated overhead costs, and two of its patientsPatient A and Patient Bis provided below:
ICU | Other | Total | |||||||
Estimated number of patient-days | 3,600 | 32,400 | 36,000 | ||||||
Estimated fixed overhead cost | $ | 5,954,400 | $ | 32,756,400 | $ | 38,710,800 | |||
Estimated variable overhead cost per patient-day | $ | 290 | $ | 123 | |||||
Patient A | Patient B | |||||
Direct materials | $ | 6,100 | $ | 7,800 | ||
Direct labor | $ | 29,000 | $ | 39,200 | ||
Total number of patient-days (including ICU) | 25 | 30 | ||||
Number of patient-days spent in ICU | 0 | 18 | ||||
Required:
1. Assuming McCullough uses only one predetermined overhead rate, calculate:
a. The predetermined overhead rate.
b. The total cost, including direct materials, direct labor and applied overhead, assigned to Patient A and Patient B.
2. Assuming McCullough calculates two overhead rates as recommended by the staff accountant, calculate:
a. The ICU and Other overhead rates.
b. The total cost, including direct materials, direct labor and applied overhead, assigned to Patient A and Patient B.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started