Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

McKay, Inc., produces a subassembly used in the production of hydraulic cylinders. The subassemblies are produced in three departments: Plate Cutting, Rod Cutting, and Welding.

McKay, Inc., produces a subassembly used in the production of hydraulic cylinders. The subassemblies are produced in three departments: Plate Cutting, Rod Cutting, and Welding. Materials are added at the beginning of the process. Overhead is applied using the following drivers and activity rates:

Driver Rate Actual Usage (by Plate Cutting)
Direct labor cost 120% of direct labor $330,000
Inspection hours $40 per hour 4,002 hours
Number of moves $100 per move 1,680 moves

During the first quarter, the Plate Cutting Department used 20,000 hours (direct, indirect, and machine hours) to produce the quarters output. Other quarterly data for the Plate Cutting Department are as follows:

Beginning work in process, January 1
Units started 90,000
Direct materials cost $720,000
Units, ending work in process (100% materials; 64% conversion), March 31 6,000

Required:

  1. Prepare a physical flow schedule.

  2. Calculate equivalent units of production for:

    1. Direct materials

    2. Conversion costs

  3. Calculate unit costs for:

    1. Direct materials

    2. Conversion costs

    3. Total manufacturing

  4. Provide the following Information:

    1. The total cost of units transferred out

    2. The journal entry for transferring costs from Plate Cutting to Welding

    3. The cost assigned to units in ending inventory

      Answer

      Check Figures:

  5. Suppose the plant manager asked the following questions:

    1. What is the actual cycle time for the conversion cost output for the plate subassembly (round to four decimal places)?

    2. What is the conversion cost rate for the first quarter, using total conversion costs and total time (round to the nearest cent)?

    3. What is the conversion cost per unit, using duration-based costing (round to the nearest cent)?

    4. According to production engineering, if efficiency were increased to an ideal level, then the cycle time should be 0.20 hours. If this were to occur, what would the cost per plate be?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamental Accounting Principles

Authors: John J Wild, Ken Shaw

25th Edition

9781260247985

Students also viewed these Accounting questions