Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Metal window boxes are manufactured in two process steps: stamping and assembly. Each window box is made up of three pieces: a base (one part

 Metal window boxes are manufactured in two process steps: stamping and assembly. Each window box is made up of three pieces: a base (one part A) and two sides (two-part Bs).

  

The parts are fabricated by a single stamping machine that requires a setup time of 120 minutes whenever switching between the two-part types. Once the machine is set up, the activity time for each part A is one minute while the activity time for each part B is only 30 seconds.

  

Currently, the stamping machine rotates its production between one batch of 360 for part A and one batch of 720 for part B. Completed parts move from the stamping machine to the assembly only after the entire batch is complete.

  

At the assembly, parts are assembled manually to form the finished product. One base (part A) and two sides (two-part Bs), as well as a number of small purchased components, are required for each unit of final product. Each product requires 27 minutes of labor time to assemble. There are currently 12 workers in assembly. There is sufficient demand to sell every box the system can make.

  

a. What is the capacity of the stamping machine?

  

b. What batch size would you recommend for the process?

 

Step by Step Solution

3.42 Rating (152 Votes )

There are 3 Steps involved in it

Step: 1

a 1 The stamping machine is set up for production of ... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Matching Supply with Demand An Introduction to Operations Management

Authors: Gerard Cachon, Christian Terwiesch

3rd edition

73525200, 978-0073525204

More Books

Students also viewed these General Management questions