Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Milton Test Laboratories does heat testing (HT) and stress testing (ST) on materials and operates at capacity. Under its current simple costing system, Milton aggregates
Milton Test Laboratories does heat testing (HT) and stress testing (ST) on materials and operates at capacity. Under its current simple costing system, Milton aggregates all operating costs of $1,190,000 into a single overhead cost pool. Milton calculates a rate per test-hour of $17 ($1,190,000 = 70,000 total test-hours). HT uses 40,000 test-hours, and ST uses 30,000 test-hours. Gary Sarsfield, Milton's controller, believes that there is enough variation in test procedures and cost structures to establish separate costing and billing rates for HT and ST. The market for test services is becoming competitive. Without this information, any miscosting and mispricing of its services could cause Milton to lose business. Sarsfield divides Milton's costs into four activity-cost categories. (Click the icon to view the activity-cost categories.) Read the requirements. Requirement 1. Classify each activity cost as output unit-level, batch-level product or service-sustaining, or facility-sustaining. Explain each answer. Cost Item Cost-type a. Direct labor Requirements b. Equipment-related costs (rent, maintenance, energy, etc.) c. Setup costs d. Costs of designing tests 1. 2. Classify each activity cost as output unit-level, batch-level, product- or service-sustaining, or facility-sustaining. Explain each answer. Calculate the cost per test-hour for HT and ST. Explain briefly the reasons why these numbers differ from the $17 per test-hour that Milton calculated using its simple costing system. Explain the accuracy of the product costs calculated using the simple costing system and the ABC system. How might Milton's management use the cost hierarchy and ABC information to better manage its business? Data table 3. a. b. c. Direct-labor costs, $126,000. These costs can be directly traced to HT, $90,000, and ST, $36,000 Equipment-related costs (rent, maintenance, energy, and so on), S350,000. These costs are allocated to HT and ST on the basis of test-hours. Setup costs, S430,000. These costs are allocated to HT and ST on the basis of the number of setup-hours required. HT requires 13,600 setup-hours, and ST requires 3,600 setup-hours. Costs of designing tests, 5264,000. These costs are allocated to HT and ST on the basis of the time required for designing the tests. HT requires 3,000 hours, and ST requires 1,400 hours Print Done d. Clear all Check
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started