Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

MIPS Inst/Cyclel 1 2 ID 6 4 MEM WB EX ID 5 EX ID IF IF MEM WB EX pipeline support MEM |WB Table 3

MIPS

image text in transcribedimage text in transcribed

Inst/Cyclel 1 2 ID 6 4 MEM WB EX ID 5 EX ID IF IF MEM WB EX pipeline support MEM |WB Table 3 Instruction Execution with There are, though, situations in the pipelining when the next instruction cannot execute in the following clock cycle. These events are called Hazards and there are three different types [1] A. Structural Hazard. When a planned instruction cannot execute in the proper clock cycle because the hardware does not support the combination of instructions that are set to execute [1] B. Data Hazard or Pipeline Data Hazard. When a planned instruction cannot execute in the proper clock cycle because data that is needed to execute the instruction is not yet available [1] C. Control Hazard or Branch Hazard. When the proper instruction cannot execute in the proper pipeline clock cycle because the instruction that was fetched is not the one that is needed; that is, the flow of instruction addresses is not what the pipeline expected [1]

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

DATABASE Administrator Make A Difference

Authors: Mohciine Elmourabit

1st Edition

B0CGM7XG75, 978-1722657802

More Books

Students also viewed these Databases questions