Question
Multi Kitchen Sdn Bhd manufactures and sells 3 type of kitchen faucets: Brass, Chrome and White. Production takes 25, 25 and 10 machine hours to
Multi Kitchen Sdn Bhd manufactures and sells 3 type of kitchen faucets: Brass, Chrome and White. Production takes 25, 25 and 10 machine hours to manufacture 1000 units batches of each of these faucets respectively.
The following data applies:
Brass Chrome White
Sales in units 30,000 50,000 40,000
Per unit data: RM RM RM
Selling price 40.00 20.00 30.00
Direct materials 8.00 4.00 8.00
Direct Labour 15.00 3.00 9.00
Overhead cost based
On direct labour hours 12.00 3.00 9.00
(Traditional system)
Hours per 1000 units:
Direct labour hours 40 10 30
Machine hours 25 25 10
Set up hours 1 0.5 1
Inspection hours 30 20 20
Total overhead costs and activities levels for the year are estimated below:
Activity Activity levels Overhead costs (RM)
Direct labour hours 2,900 hours
Machine hours 2,400 hours
Set ups 95 set up hours 465,500
Inspections 2,700 inspection hrs 405,000
870,500
Required:
- Using the traditional system, determine the operating profit per unit for the Brass faucet (2 marks)
- Determine the activity cost driver for set up costs and inspection costs. (3 marks)
- Using the activity-based costing ABC system, for Brass faucets:
- Compute the estimated overhead cost per unit (8 marks)
- Compute the estimated operating profit per unit (2 marks)
- Explain the difference between profits obtained from the traditional system and the ABC system. (2 marks)
- Advice which system provides a better estimate of profitability and why is that so? (3 marks)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started