Natural Furniture Company manufactures three outdoor products, chairs, benches, and tables. Each product must pass through the following departments before it is shipped: sawing, sanding,
Natural Furniture Company manufactures three outdoor products, chairs, benches, and tables. Each product must pass through the following departments before it is shipped: sawing, sanding, assembly, and painting. The time requirements (in hours) are summarized in the tables below.
The production time available in each department each week and the minimum weekly production requirement to fulfill contracts are as follows:
Minimum | |||
Capacity | Production | ||
Department | (In Hours) | Product | Level |
Sawing | 450 | Chairs | 100 |
Sanding | 400 | Benches | 50 |
Assembly | 625 | Tables | 50 |
Painting | 550 |
Hours Required | Unit | ||||
Product | Sawing | Sanding | Assembly | Painting | Profit |
Chairs | 1.5 | 1.0 | 2.0 | 1.5 | $15 |
Benches | 1.5 | 1.5 | 2.0 | 2.0 | $10 |
Tables | 2.0 | 2.0 | 2.5 | 2.0 | $20 |
The production manager has the responsibility of specifying production levels for each product for the coming week. Formulate as a linear programming problem to maximize profit.
What mix of products would yield maximum profit?
Formulate as an LP problem to maximize profit. What is the maximum profit? Use SOLVER in EXCEL to calculate
A. | ||
B. | ||
C. | ||
D. |
Step by Step Solution
3.50 Rating (157 Votes )
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started