Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Nautilus Water Pumps, Inc.Internal Controls Assessment (Prepared by Scott Pasquale and Kyle Smith, Lehigh University) Nautilus Water Pumps, Inc., manufactures automotive water pumps. Since 1988

image text in transcribed

Nautilus Water Pumps, Inc.Internal

Controls Assessment

(Prepared by Scott Pasquale and Kyle

Smith, Lehigh University)

Nautilus Water Pumps, Inc., manufactures

automotive water pumps. Since 1988 it has

supplied the Big Three (Ford Motor Company,

General Motors, and Chrysler) North American

auto manufacturers. Nautilus has recently broken

into the American-made Japanese car market.

The company now supplies Toyota, Nissan,

and Honda with automotive water pumps for

their assembly operations in North America.

Conversion Cycle

At the start of the year each automobile manufacturer

provides Nautilus with an order

that is based on budgeted sales predictions.

However, this order is guaranteed for only

the first month; after that each automobile

manufacturer can revise orders on a monthly

basis. Nautiluss current system requires

orders for RM to be placed with suppliers on

a quarterly basis. While the order provides

a general idea of what is to be expected, orders

from the automobile manufacturers can

increase or decrease dramatically after the

initial month.

Under the current batch production process

in the conversion cycle, the blanket order is

sent directly to the production, planning, and

control phase. In this phase, the material and

operation requirements are determined. It is

here that the necessary production documents

(bills of materials, route sheets) are created and

combined with inventory status reports from

inventory control and the required engineering

specifications from the engineering department

in order to create a purchase requisition. Currently,

the production-scheduling phase falls

under the responsibility of the work center. At

the work center, the supervisor in charge prepares

work orders, move tickets, and materials

requisitions. These documents are sent to

the cost accounting department and are also

used to create an open work order file. The

work center also retains copies of these documents

so they can be used to initiate production

activities. Under the current system, once

production is initiated, any excess material is

immediately scrapped. The work center also

prepares the necessary time-keeping documents

(payroll time card and job tickets) and

sends this information to the cost accounting

department as well. Upon completion of the

production cycle, the production schedule and

move tickets are used to close the open work

order file, while one copy of the work order is

sent to the FG warehouse

At the start of the production phase, a

copy of the materials requisition is sent to

storekeeping so that the necessary RM can be

issued to the work center. A copy of the materials

requisition is kept on file in storekeeping.

Inventory control is involved in the

batch production process throughout the

entire operation. It releases the inventory

status document to production, planning,

and control so that materials and operations

requirements can be determined. A copy of

the materials requisition document is received

from storekeeping so that inventory files can be

updated. Once files are updated, the materials

requisition is sent to cost accounting, while the

updated files are also used to prepare a journal

voucher that is sent to the GL department.

A copy of the materials requisition, purchase

requisition, and work order documents are

kept on file in inventory control.

Once the cost accounting department

has received all the necessary information

from the other departments, the workin-

process (WIP) file is updated. All work

center documents (move tickets, job tickets,

materials requisitions, excess materials, and

materials returns), along with a copy of the

work order, are filed in the cost accounting

department. At the end of the phase the cost

accounting department prepares a journal

voucher and sends it to the GL department.

This journal voucher, along with the one

sent by inventory control, is used to update

the GL. Both journal vouchers are kept on

file in the GL department.

Required:

a. Create a data flow diagramRequired:

a. Create a data flow diagram (DFD) of the

current system.

b. Create a document flowchart of the existing

system.

c. Analyze the internal control weaknesses in

the system. Model your response according

to the six categories of physical control

activities specified in SAS 78.

d. Prepare a system flowchart of a redesigned

computer-based system that resolves the

control weaknesses you identified.

image text in transcribed Nautilus Water Pumps, Inc.Internal Controls Assessment (Prepared by Scott Pasquale and Kyle Smith, Lehigh University) Nautilus Water Pumps, Inc., manufactures automotive water pumps. Since 1988 it has supplied the Big Three (Ford Motor Company, General Motors, and Chrysler) North American auto manufacturers. Nautilus has recently broken into the American-made Japanese car market. The company now supplies Toyota, Nissan, and Honda with automotive water pumps for their assembly operations in North America. Conversion Cycle At the start of the year each automobile manufacturer provides Nautilus with an order that is based on budgeted sales predictions. However, this order is guaranteed for only the first month; after that each automobile manufacturer can revise orders on a monthly basis. Nautilus's current system requires orders for RM to be placed with suppliers on a quarterly basis. While the order provides a general idea of what is to be expected, orders from the automobile manufacturers can increase or decrease dramatically after the initial month. Under the current batch production process in the conversion cycle, the blanket order is sent directly to the production, planning, and control phase. In this phase, the material and operation requirements are determined. It is here that the necessary production documents (bills of materials, route sheets) are created and combined with inventory status reports from inventory control and the required engineering specifications from the engineering department in order to create a purchase requisition. Currently, the production-scheduling phase falls under the responsibility of the work center. At the work center, the supervisor in charge prepares work orders, move tickets, and materials requisitions. These documents are sent to the cost accounting department and are also used to create an open work order file. The work center also retains copies of these documents so they can be used to initiate production activities. Under the current system, once production is initiated, any excess material is immediately scrapped. The work center also prepares the necessary time-keeping documents (payroll time card and job tickets) and sends this information to the cost accounting department as well. Upon completion of the production cycle, the production schedule and move tickets are used to close the open work order file, while one copy of the work order is sent to the FG warehouse At the start of the production phase, a copy of the materials requisition is sent to storekeeping so that the necessary RM can be issued to the work center. A copy of the materials requisition is kept on file in storekeeping. Inventory control is involved in the batch production process throughout the entire operation. It releases the inventory status document to production, planning, and control so that materials and operations requirements can be determined. A copy of the materials requisition document is received from storekeeping so that inventory files can be updated. Once files are updated, the materials requisition is sent to cost accounting, while the updated files are also used to prepare a journal voucher that is sent to the GL department. A copy of the materials requisition, purchase requisition, and work order documents are kept on file in inventory control. Once the cost accounting department has received all the necessary information from the other departments, the workinprocess (WIP) file is updated. All work center documents (move tickets, job tickets, materials requisitions, excess materials, and materials returns), along with a copy of the work order, are filed in the cost accounting department. At the end of the phase the cost accounting department prepares a journal voucher and sends it to the GL department. This journal voucher, along with the one sent by inventory control, is used to update the GL. Both journal vouchers are kept on file in the GL department. Required: a. Create a data flow diagramRequired: a. Create a data flow diagram (DFD) of the current system. b. Create a document flowchart of the existing system. c. Analyze the internal control weaknesses in the system. Model your response according to the six categories of physical control activities specified in SAS 78. d. Prepare a system flowchart of a redesigned computer-based system that resolves the control weaknesses you identified

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Health Care Management

Authors: Sharon B. Buchbinder, Nancy H. Shanks

3rd Edition

128408101X, 9781284081015

Students also viewed these Accounting questions

Question

Explain the importance of staffing in business organisations

Answered: 1 week ago

Question

What are the types of forms of communication ?

Answered: 1 week ago

Question

Explain the process of MBO

Answered: 1 week ago