Question
Nautilus Water Pumps, Inc.Internal Controls Assessment (Prepared by Scott Pasquale and Kyle Smith, Lehigh University) Nautilus Water Pumps, Inc., manufactures automotive water pumps. Since 1988
Nautilus Water Pumps, Inc.Internal
Controls Assessment
(Prepared by Scott Pasquale and Kyle
Smith, Lehigh University)
Nautilus Water Pumps, Inc., manufactures
automotive water pumps. Since 1988 it has
supplied the Big Three (Ford Motor Company,
General Motors, and Chrysler) North American
auto manufacturers. Nautilus has recently broken
into the American-made Japanese car market.
The company now supplies Toyota, Nissan,
and Honda with automotive water pumps for
their assembly operations in North America.
Conversion Cycle
At the start of the year each automobile manufacturer
provides Nautilus with an order
that is based on budgeted sales predictions.
However, this order is guaranteed for only
the first month; after that each automobile
manufacturer can revise orders on a monthly
basis. Nautiluss current system requires
orders for RM to be placed with suppliers on
a quarterly basis. While the order provides
a general idea of what is to be expected, orders
from the automobile manufacturers can
increase or decrease dramatically after the
initial month.
Under the current batch production process
in the conversion cycle, the blanket order is
sent directly to the production, planning, and
control phase. In this phase, the material and
operation requirements are determined. It is
here that the necessary production documents
(bills of materials, route sheets) are created and
combined with inventory status reports from
inventory control and the required engineering
specifications from the engineering department
in order to create a purchase requisition. Currently,
the production-scheduling phase falls
under the responsibility of the work center. At
the work center, the supervisor in charge prepares
work orders, move tickets, and materials
requisitions. These documents are sent to
the cost accounting department and are also
used to create an open work order file. The
work center also retains copies of these documents
so they can be used to initiate production
activities. Under the current system, once
production is initiated, any excess material is
immediately scrapped. The work center also
prepares the necessary time-keeping documents
(payroll time card and job tickets) and
sends this information to the cost accounting
department as well. Upon completion of the
production cycle, the production schedule and
move tickets are used to close the open work
order file, while one copy of the work order is
sent to the FG warehouse
At the start of the production phase, a
copy of the materials requisition is sent to
storekeeping so that the necessary RM can be
issued to the work center. A copy of the materials
requisition is kept on file in storekeeping.
Inventory control is involved in the
batch production process throughout the
entire operation. It releases the inventory
status document to production, planning,
and control so that materials and operations
requirements can be determined. A copy of
the materials requisition document is received
from storekeeping so that inventory files can be
updated. Once files are updated, the materials
requisition is sent to cost accounting, while the
updated files are also used to prepare a journal
voucher that is sent to the GL department.
A copy of the materials requisition, purchase
requisition, and work order documents are
kept on file in inventory control.
Once the cost accounting department
has received all the necessary information
from the other departments, the workin-
process (WIP) file is updated. All work
center documents (move tickets, job tickets,
materials requisitions, excess materials, and
materials returns), along with a copy of the
work order, are filed in the cost accounting
department. At the end of the phase the cost
accounting department prepares a journal
voucher and sends it to the GL department.
This journal voucher, along with the one
sent by inventory control, is used to update
the GL. Both journal vouchers are kept on
file in the GL department.
Required:
a. Create a data flow diagramRequired:
a. Create a data flow diagram (DFD) of the
current system.
b. Create a document flowchart of the existing
system.
c. Analyze the internal control weaknesses in
the system. Model your response according
to the six categories of physical control
activities specified in SAS 78.
d. Prepare a system flowchart of a redesigned
computer-based system that resolves the
control weaknesses you identified.
Nautilus Water Pumps, Inc.Internal Controls Assessment (Prepared by Scott Pasquale and Kyle Smith, Lehigh University) Nautilus Water Pumps, Inc., manufactures automotive water pumps. Since 1988 it has supplied the Big Three (Ford Motor Company, General Motors, and Chrysler) North American auto manufacturers. Nautilus has recently broken into the American-made Japanese car market. The company now supplies Toyota, Nissan, and Honda with automotive water pumps for their assembly operations in North America. Conversion Cycle At the start of the year each automobile manufacturer provides Nautilus with an order that is based on budgeted sales predictions. However, this order is guaranteed for only the first month; after that each automobile manufacturer can revise orders on a monthly basis. Nautilus's current system requires orders for RM to be placed with suppliers on a quarterly basis. While the order provides a general idea of what is to be expected, orders from the automobile manufacturers can increase or decrease dramatically after the initial month. Under the current batch production process in the conversion cycle, the blanket order is sent directly to the production, planning, and control phase. In this phase, the material and operation requirements are determined. It is here that the necessary production documents (bills of materials, route sheets) are created and combined with inventory status reports from inventory control and the required engineering specifications from the engineering department in order to create a purchase requisition. Currently, the production-scheduling phase falls under the responsibility of the work center. At the work center, the supervisor in charge prepares work orders, move tickets, and materials requisitions. These documents are sent to the cost accounting department and are also used to create an open work order file. The work center also retains copies of these documents so they can be used to initiate production activities. Under the current system, once production is initiated, any excess material is immediately scrapped. The work center also prepares the necessary time-keeping documents (payroll time card and job tickets) and sends this information to the cost accounting department as well. Upon completion of the production cycle, the production schedule and move tickets are used to close the open work order file, while one copy of the work order is sent to the FG warehouse At the start of the production phase, a copy of the materials requisition is sent to storekeeping so that the necessary RM can be issued to the work center. A copy of the materials requisition is kept on file in storekeeping. Inventory control is involved in the batch production process throughout the entire operation. It releases the inventory status document to production, planning, and control so that materials and operations requirements can be determined. A copy of the materials requisition document is received from storekeeping so that inventory files can be updated. Once files are updated, the materials requisition is sent to cost accounting, while the updated files are also used to prepare a journal voucher that is sent to the GL department. A copy of the materials requisition, purchase requisition, and work order documents are kept on file in inventory control. Once the cost accounting department has received all the necessary information from the other departments, the workinprocess (WIP) file is updated. All work center documents (move tickets, job tickets, materials requisitions, excess materials, and materials returns), along with a copy of the work order, are filed in the cost accounting department. At the end of the phase the cost accounting department prepares a journal voucher and sends it to the GL department. This journal voucher, along with the one sent by inventory control, is used to update the GL. Both journal vouchers are kept on file in the GL department. Required: a. Create a data flow diagramRequired: a. Create a data flow diagram (DFD) of the current system. b. Create a document flowchart of the existing system. c. Analyze the internal control weaknesses in the system. Model your response according to the six categories of physical control activities specified in SAS 78. d. Prepare a system flowchart of a redesigned computer-based system that resolves the control weaknesses you identifiedStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started