Need help with parts b-f. Thank you so much! Dr. Lori Baker, operations manager at Nesa Electronics, prides herself on excellent assembly-line balancing. She has
Need help with parts b-f. Thank you so much!
Dr. Lori Baker, operations manager at Nesa Electronics, prides herself on excellent assembly-line balancing. She has been told that the firm needs to complete 120 instruments per 24-hour day. The assembly-line activities are: This exercise only contains parts b,c,d,e,f, and g. b) For the given daily (24-hour) production rate of 90 units, the highest allowable cycle time = minutes (enter your response as a whole number). c) If the cycle time after allowances is given as 10 minutes, then the effective daily (24-hour) production rate = units (enter your response as a whole number). d) For the given 10-minute cycle time after allowances, the theoretical minimum number of workstations = (round your response up to the next whole number). e) Using the longest assigned task time of all of the workstations and 6 workstations, the operating efficiency of the assembly line =93.33% (enter your response as a percentage rounded to two decimal places). f) Using the 10-minute cycle time after allowances and 6 workstations, the idle time for the assembly line per cycle = minutes (enter your response as a whole number). g) The correct precedence relationship with one of the possible assignments of tasks to workstations for the given 10-minute cycle time is shown in Fig. 1Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started