Answered step by step
Verified Expert Solution
Question
1 Approved Answer
need the answers to the yellow boxes only. A B C D E F G H I J K 1 No 26 Month of January
need the answers to the yellow boxes only.
A B C D E F G H I J K 1 No 26 Month of January 27 28 Selected information for January is presented below. Note that the applied overhead rate was 29 50% of direct labor costs in the molding department 33 34 Molding Department 35 36 Goods in-process as of January 1 were 3,300 figurines at a cost of $53.790.00. Of this amount, $52,800.00 was from 39 raw materials added, 5660.00 for labor and $330.00 for overhead. These 3,300 figurines were assumed to be 40 10.00% complete as to labor and overhead. 42 During January, 23,000 units were started, $370,530.00 of materials and $46,340.00 of labor costs were incurred. 46 The 7,000 figurines that were in-process at the end of January were assumed to be 60.00% complete to 47 labor and overhead. 48 49 All figurines in January passed inspection Introduction FAQ 1 2 11 12 13 Tvne here to search T OBA 2a 9 January co 8 MOLDING 13 Physical Flow of Units 14 15 Work in Process - Beginning 16 Units Started this Period 17 Units to Account for (12.01 3,300 units 23 000 units 6 300 units! 21 {12.02) 22 Total transferred out 23 Work-in-Process - Ending 24 Total Accounted for (12.03) [1204 12.05 Equivalent Units Material (Round to three places, ##.###.##) 12.063 Introduction FAQ 1 2 11 12 Type here to search Cost of the units transferred, material and convesion (Round to two places, S###.###.##) {12.14 CO NAWNO Cost of the ending inventory, material and convesion (Round to two places, $###.###.##). {12.15) 10 Total Cost accounted for (Round to two places, $###.###.## ) {12.16) Introduction FAQ 1 2 @ Type here to search O PO a @ @ H elsi vou U POLUS, TUD) Equivalent Units Conversion (Round to three places, ##.###.###) {12.07) Total cost in the Beginning Inventory (Round to two places, ##.###.## (1208) :888888888 Total cost of Material this period (Round to two places, ##.###.# (12.09) Introduction FAQ 1 2 11 12 13 Type here to search Ria Total cost of Conversion this period (Round to two places, ##.###.##) (12103 83 Total cost to account for (Round to two places, ##.###.##) {12.11) 87 Cost per equivalent unit of Material this period (Round to seven places, ###.###***) (12.12) Cost per equivalent unit of Conversion this period (Round to sevd places, www.wwwwww) {12.13) Introduction FAQ 1 50 - _ o a Type here to search @ X 4 25 Job Order Costing Section 26 27 On January 1, 20x2, Division S began Job 2407 for the Client, THE BIG CHILDREN STORE. The 28 job called for 4,000 customized lamps. The following set of transactions occurred from 33 January 5 until the job was completed: 34 5-Jan Purchased 4.000 Lamp Kits @ $16.65 per kit 9-Jan 4,050 sets of Lamp Kits were requisitioned, including all those in the Beginning Inventory 17-Jan Payroll of 580 Direct Labor Hours @ $9.80 per hour 30-Jan Payroll of 630 Direct Labor Hours @ $10.05 per hour. 30-Jan 3,990 lamps were completed and shipped. All materials requisitioned were used or scrapped, and are a cost of normal processing Month End Overhead Information Actual Variable Manufacturing Overhead Actual Fixed Manufacturing Overhead $ 1,476 20 $ 39,873.45 + Introduction FAQ 1 2 11 12 Type here to search 596 ABCD Round to two places. S ** Cost of Direct Material incurred in Manufacturing Job 2407 (1301) Cost of Direct Labor Incurred in Manufacturing Job 2407 {13.02) Cost of Manufacturing Overhead Applied to Job 2407 {13.03} Cost of manufacturing one lamp {13.04 FAQ |1 2 11 12 13 Type here to search A B C D E F G H I J K 1 No 26 Month of January 27 28 Selected information for January is presented below. Note that the applied overhead rate was 29 50% of direct labor costs in the molding department 33 34 Molding Department 35 36 Goods in-process as of January 1 were 3,300 figurines at a cost of $53.790.00. Of this amount, $52,800.00 was from 39 raw materials added, 5660.00 for labor and $330.00 for overhead. These 3,300 figurines were assumed to be 40 10.00% complete as to labor and overhead. 42 During January, 23,000 units were started, $370,530.00 of materials and $46,340.00 of labor costs were incurred. 46 The 7,000 figurines that were in-process at the end of January were assumed to be 60.00% complete to 47 labor and overhead. 48 49 All figurines in January passed inspection Introduction FAQ 1 2 11 12 13 Tvne here to search T OBA 2a 9 January co 8 MOLDING 13 Physical Flow of Units 14 15 Work in Process - Beginning 16 Units Started this Period 17 Units to Account for (12.01 3,300 units 23 000 units 6 300 units! 21 {12.02) 22 Total transferred out 23 Work-in-Process - Ending 24 Total Accounted for (12.03) [1204 12.05 Equivalent Units Material (Round to three places, ##.###.##) 12.063 Introduction FAQ 1 2 11 12 Type here to search Cost of the units transferred, material and convesion (Round to two places, S###.###.##) {12.14 CO NAWNO Cost of the ending inventory, material and convesion (Round to two places, $###.###.##). {12.15) 10 Total Cost accounted for (Round to two places, $###.###.## ) {12.16) Introduction FAQ 1 2 @ Type here to search O PO a @ @ H elsi vou U POLUS, TUD) Equivalent Units Conversion (Round to three places, ##.###.###) {12.07) Total cost in the Beginning Inventory (Round to two places, ##.###.## (1208) :888888888 Total cost of Material this period (Round to two places, ##.###.# (12.09) Introduction FAQ 1 2 11 12 13 Type here to search Ria Total cost of Conversion this period (Round to two places, ##.###.##) (12103 83 Total cost to account for (Round to two places, ##.###.##) {12.11) 87 Cost per equivalent unit of Material this period (Round to seven places, ###.###***) (12.12) Cost per equivalent unit of Conversion this period (Round to sevd places, www.wwwwww) {12.13) Introduction FAQ 1 50 - _ o a Type here to search @ X 4 25 Job Order Costing Section 26 27 On January 1, 20x2, Division S began Job 2407 for the Client, THE BIG CHILDREN STORE. The 28 job called for 4,000 customized lamps. The following set of transactions occurred from 33 January 5 until the job was completed: 34 5-Jan Purchased 4.000 Lamp Kits @ $16.65 per kit 9-Jan 4,050 sets of Lamp Kits were requisitioned, including all those in the Beginning Inventory 17-Jan Payroll of 580 Direct Labor Hours @ $9.80 per hour 30-Jan Payroll of 630 Direct Labor Hours @ $10.05 per hour. 30-Jan 3,990 lamps were completed and shipped. All materials requisitioned were used or scrapped, and are a cost of normal processing Month End Overhead Information Actual Variable Manufacturing Overhead Actual Fixed Manufacturing Overhead $ 1,476 20 $ 39,873.45 + Introduction FAQ 1 2 11 12 Type here to search 596 ABCD Round to two places. S ** Cost of Direct Material incurred in Manufacturing Job 2407 (1301) Cost of Direct Labor Incurred in Manufacturing Job 2407 {13.02) Cost of Manufacturing Overhead Applied to Job 2407 {13.03} Cost of manufacturing one lamp {13.04 FAQ |1 2 11 12 13 Type here to searchStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started