Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Need this assigment done. Read the description (1st picture) to fully understand. Need this assignment done. Read the description (2nd picture) to fully understand The

Need this assigment done. Read the description (1st picture) to fully understand.
image text in transcribed
image text in transcribed
Need this assignment done. Read the description (2nd picture) to fully understand
image text in transcribed
image text in transcribed
image text in transcribed
The last 3 pictures are clearly visible.
Description Please perform the earned value analysis as asked in the attached file in question 1. Draw S Curve in question 2. Upload the solution. 11 A masen contracted with a general contractor to build an exterior wall from 8-inch CMU. The total CMUs to be installed are 738. The main must finish the wall in 3 days and gets paid S4 per block. At the end of day 1, the mason las installed 220 blocks. His actual con including overhead and profit) $8.16. Analyze the situation with regard to both the budget and the schedule. (16 points) Description complete Budgeted Cost Ws CWP ACWP CV SV BCWP-ACW CW CWS Syd SA sv/daily WWW/WS planned budget Based on the values in above table what is your analysis of the project in terms of cost and schedule? Page 1 of 2 2. Draw S-Curve for the masonry job in the previous question. (10 points) Budget Data Date 100% 90% 8096 70% 60% 50% 409 306 20% 10% 2 3 Day A mason contracted with a general contractor to build an exterior wall from 8-inch CMUS. The total CMUs to be installed are 738. The mase must finish the wall in 3 days and gets paid S4 per block. At the end of day I, the mason has installed 220 blocks. His actual cost (including overhead and profit) is 8836. Analyze the situation with regard to both the budget and the schedule. (10 points) Description % complete Budgeted Cost BCWS BCWP ACWP CV SV BCWP-ACWP BCWP-BCWS CPI SPI BCWP/ACWPBCWP/BCWS SV days sv/daily planned budget Based on the values in above table what in your analysis of the project in terms of cost and schodule? Page 1 of 2 Description Please perform the earned value analysis as asked in the attached file in question 1. Draw S Curve in question 2. Upload the solution. Draw S-Curve for the masonry job in the previous question. (10 points) Budget Data Date 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 2 3 Day Description Please perform the earned value analysis as asked in the attached file in question 1. Draw S Curve in question 2. Upload the solution. 11 A masen contracted with a general contractor to build an exterior wall from 8-inch CMU. The total CMUs to be installed are 738. The main must finish the wall in 3 days and gets paid S4 per block. At the end of day 1, the mason las installed 220 blocks. His actual con including overhead and profit) $8.16. Analyze the situation with regard to both the budget and the schedule. (16 points) Description complete Budgeted Cost Ws CWP ACWP CV SV BCWP-ACW CW CWS Syd SA sv/daily WWW/WS planned budget Based on the values in above table what is your analysis of the project in terms of cost and schedule? Page 1 of 2 2. Draw S-Curve for the masonry job in the previous question. (10 points) Budget Data Date 100% 90% 8096 70% 60% 50% 409 306 20% 10% 2 3 Day A mason contracted with a general contractor to build an exterior wall from 8-inch CMUS. The total CMUs to be installed are 738. The mase must finish the wall in 3 days and gets paid S4 per block. At the end of day I, the mason has installed 220 blocks. His actual cost (including overhead and profit) is 8836. Analyze the situation with regard to both the budget and the schedule. (10 points) Description % complete Budgeted Cost BCWS BCWP ACWP CV SV BCWP-ACWP BCWP-BCWS CPI SPI BCWP/ACWPBCWP/BCWS SV days sv/daily planned budget Based on the values in above table what in your analysis of the project in terms of cost and schodule? Page 1 of 2 Description Please perform the earned value analysis as asked in the attached file in question 1. Draw S Curve in question 2. Upload the solution. Draw S-Curve for the masonry job in the previous question. (10 points) Budget Data Date 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 2 3 Day

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Operational Auditing Handbook Auditing Business And IT Processes

Authors: Andrew Chambers, Graham Rand

2nd Edition

0470744766, 978-0470744765

More Books

Students also viewed these Accounting questions

Question

Describe new developments in the design of pay structures. page 475

Answered: 1 week ago