Network Design NIA Manufacturing needs to build a new plant to serve four market regions. NIA has three supply sources. The coordinates of location, the
Network Design
NIA Manufacturing needs to build a new plant to serve four market regions. NIA has three supply sources. The coordinates of location, the demand of each market region, maximum units from each supply source and the shipping cost from each supply source or to each market region are shown in the data set linked below.
Network Design Data Set (XLSX)Download Network Design Data Set (XLSX)
Where should NIA locate its plant?
In your own words explain the computation or the formula for the distance between facility and location (x,y) and supply source/market. Also, explain the computation/formula for Total Cost.
$/Ton Mile | Dn | Xn | Yn | ||
Supply Sources | S1 | 1.8 | 190 | 222 | 730 |
S2 | 2.1 | 160 | 660 | 450 | |
S3 | 1.2 | 130 | 582 | 450 | |
Markets | M1 | 1.2 | 120 | 576 | 420 |
M2 | 2.3 | 95 | 245 | 100 | |
M3 | 1.4 | 75 | 481 | 900 | |
M4 | 2.9 | 105 | 810 | 380 |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started