Network Diagram Practice
Base your analysis of the following three projects on the information in the table. Each project has been defined to contain a list of activities/tasks (each identified by letter) along with the immediate predecessor activities and the optimistic, most likely, and pessimistic time estimates (in days) for completion.
Project A:
- Use the 3-point (PERT) method to calculate the normal duration for each task (round to the nearest whole number) and enter in table.
- Construct a labeled network diagram (include duration, early/late times) on paper then insert the image below the table.
- Calculate and enter the free slack and total slack for each task in the table.
- List all paths with durations and identify the critical path.
Task | Predecessor | a | m | b | Normal duration | Free Slack | Total Slack |
A | --- | 3 | 4 | 7 | |||
B | --- | 4 | 6 | 10 | |||
C | A, B | 5 | 8 | 11 | |||
D | A | 8 | 9 | 12 | |||
E | C | 7 | 8 | 9 |
Project B:
- Use the 3-point (PERT) method to calculate the normal duration for each task (round to the nearest whole number) and enter in table.
- Construct a labeled network diagram (include duration, early/late times) on paper then insert the image below the table.
- Calculate and enter the free slack and total slack for each task in the table.
- List all paths with durations and identify the critical path.
Task | Predecessor | a | m | b | Normal duration | Free Slack | Total Slack |
A | --- | 4 | 4 | 8 | |||
B | A | 3 | 4 | 6 | |||
C | B | 4 | 7 | 10 | |||
D | A | 6 | 9 | 11 | |||
E | D | 7 | 10 | 12 | |||
F | E | 5 | 8 | 12 | |||
G | E | 6 | 7 | 9 | |||
H | C | 15 | 16 | 18 |
Project C:
- Use the 3-point (PERT) method to calculate the normal duration for each task (round to the nearest whole number) and enter in table.
- Construct a labeled network diagram (include duration, early/late times) on paper then insert the image below the table.
- Calculate and enter the free slack and total slack for each task in the table.
- List all paths with durations and identify the critical path.
Task | Predecessor | a | m | b | Normal duration | Free Slack | Total Slack |
A | --- | 4 | 4 | 7 | |||
B | --- | 3 | 4 | 5 | |||
C | --- | 4 | 7 | 10 | |||
D | B, C | 6 | 8 | 10 | |||
E | A | 7 | 9 | 12 | |||
F | D, E | 3 | 4 | 12 | |||
G | C | 6 | 7 | 9 | |||
H | F, G | 10 | 12 | 15 | |||
I | E | 14 | 14 | 18 |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started