Norwall Company's budgeted variable manufacturing overhead cost is $1.20 per machine-hour and its budgeted fixed manufacturing overhead is $105,966 per month. The following information is available for a recent month: a. The denominator activity of 33,640 machine-hours is used to compute the predetermined overhead rate. b. At a denominator activity of 33,640 machine-hours, the company should produce 11,600 units of product. c. The company's actual operating results were: Number of units produced Actual machine-hours Actual variable manufacturing overl Actual fixed manufacturing overheas Required: 1. Compute the predetermined overhead rate and break it down into wariahla and fivad roct Required: 1. Compute the predetermined overhead rate and break it down c. Ine company's actual operating results were: Number of units produced Actual machine-hours Actual variable manufacturing overh Actual fixed manufacturing overhead Required: 1. Compute the predetermined overhead rate and break it down into variable and fixed cost elements. (Round your answers to 2 decimal places.) 2. Compute the standard hours allowed for the actual production. 3. Compute the variable overhead rate and efficiency variances and the fixed overhead budget and volume variances. (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance). Input all amounts as positive values. Round your intermediate calculations and final answers to 2 decimal places.) \begin{tabular}{|l|l|} \hline 1. Predetermined overhead rate & per MH \\ \hline 1. Variable element & per MH \\ \hline 1. Fixed element & per MH \\ \hline 2. Standard hours allowed for the actual production & MHs \\ \hline 3. Variable overhead rate variance & \\ \hline 3. Variable overhead efficiency variance & \\ \hline 3. Fixed overhead budget variance & \\ \hline 3. Fixed nverhead vnlume varianre & \\ \hline \end{tabular}