nts Suped Moody Corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates Machine-hour required to support estimated production 153,000 Fixed manufacturing overhead cost $ 656,000 Variable manufacturing overhead cont per machine-hour $ 4.70 Required: 1. Compute the plantwide predetermined overhead rote. 2. During the year, Job 400 was started and completed. The following information was avallable with respect to this job: Direct materials $ 330 Direct labor cost $ 290 Machine-hours used 39 Compute the total manufacturing cost assigned to Job 400. 3. If Job 400 includes 50 units, what is the unit product cost for this job? 4. If Moody uses a markup percentage of 110% of its total manufacturing cost, then whot selling price per unit would it have established for Job 4007 eBook Print References Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required) Required 4 Compute the plantwide predetermined overhead rate. (Round your answer to 2 decimal places.) Predetermined overhead rato Der M Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Required 4 Compute the plantwide predetermined overhead rate. (Round your answer to 2 decimal places.) Predetermined overhead rato Roquired 1 Required 2 > per MH Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Required 4 Compute the total manufacturing cost assigned to Job 400. (Round your intermediate calculations to 2 decimal places and your final answer to the nearest dollar amount.) Total manufacturing cost Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Required 4 If Job 400 Includes 50 units, what is the unit product cost for this job? (Round your intermediate calculations and final answer to the nearest whole dollar) Unit product cost