Question
NWR MINING COMPANY New World Resources Plc (NWR), London based company is a hard coal and coke producers. The Company produces coking and thermal coal
NWR MINING COMPANY
New World Resources Plc (NWR), London based company is a hard coal and coke producers.
The Company produces coking and thermal coal for the steel and energy sectors in Central
Europe through its subsidiary. NWR's coke subsidiary, OKK Koksovny, a.s. (OKK) is a producer
of foundry coke. NWR supplies to a customer base in the region, including ArcelorMittal, U.S.
Steel, voestalpine, Dalkia, CEZ, Verbund, Moravia Steel, and ThyssenKrupp. NWR mines in the
Czech Republic and has several development projects in both Poland and the Czech Republic.
The coal mining industry, especially high-sulfur coal operations such as NWR, has been hard-hit
by environmental regulations and warmer than expected winter 2014/2015. Recently, however,
a combination of increased demand for coal and new pollution reduction technologies has led to
an improved market demand for high-sulfur coal. NWR has just been approached by Opole
Electric Company with a request to supply coal for its electric generators for the next four years.
NWR does not have enough excess capacity at its existing mines to guarantee the contract. The
company is considering opening a strip mine in Walbrzych on 5,000 acres of land purchased 10
years ago for $6 million. Based on a recent appraisal, the company feels it could receive $7
million on an after-tax basis if it sold the land today.
Strip mining is a process where the layers of topsoil above a coal vein are removed and the
exposed coal is removed. Changes in mining regulations now force a company to reclaim the
land; that is, when the mining is completed, the land must be restored to near its original
condition. The land can then be used for other purposes. Because it is currently operating at full
capacity, NWR will need to purchase additional necessary equipment, which will cost $85
million. The equipment will be depreciated on a seven-year linear schedule. The contract runs
for only four years. At that time the coal from the site will be entirely mined. The company feels
that the equipment can be sold for 60 percent of its initial purchase price in four years.
The contract calls for the delivery of 500,000 tons of coal per year at a price of $95 per ton.
NWR feels that coal production will be 620,000 tons, 680,000 tons, 730,000 tons, and 590,000 tons, respectively, over the next four years. The excess production will be sold in the spot
market at an average of $88 per ton but the spot prices are highly volatile. The fact should be
taken into consideration in the analysis. Variable costs amount to $31 per ton, and fixed costs
are $4,300,000 per year. The mine will require a net working capital of 5 percent of sales. The
NWC will be built up in the year prior to the sales.
NWR will be responsible for reclaiming the land at termination of the mining. This will occur in
year 5. The company uses an outside company for reclamation of all the companys strip mines.
It is estimated the cost of reclamation will be $2.8 million. NWR faces a 19 percent tax rate and
has a 12 percent required return on invested capital. Assume that a loss in any year will result
in a tax credit.
You have been approached by the CFO of the company with a request to analyze the project.
Calculate the payback period, net present value, internal rate of return for the new strip mine.
Prepare also sensitivity analysis of this project. Should NWR Mining take the contract and open
the mine
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started