och 20.pdf Opec w to Google Docs P20-3A Eosinc. is a construction company specialising in custom putions. The patios con structed of concrete, bric, fibergland lumber, depending upon customer preference One 1.2008, the real ledger for sine contains the following data Raw Materials Inventory 54.200 Manufacturing Overhead Applied 2440 Work in Process laventory 55.540 Manufacturing Overhead incurred $1.50 Subsidiary data for Work in Process Inventary on June 1 are at follows Job Cond Sheets Custoja Cost Eleme Fuler Direct materials 5 600 5 800 5900 Direct labor 320 SAD 400 Manufacturing overhead 675 2015 513320 During materials purchased on account were 55.900, and all were Additional overhead cons come of depreciation of equipment 200 cm of 5000 incurred on count A summary of materials requisition tips and time tickets for June show the follows Customer Materials Requisiti Sly The Tide Fowler 50 + Paco och 20.pdf Opec w to Google Docs P20-3A Eosinc. is a construction company specialising in custom putions. The patios con structed of concrete, bric, fibergland lumber, depending upon customer preference One 1.2008, the real ledger for sine contains the following data Raw Materials Inventory 54.200 Manufacturing Overhead Applied 2440 Work in Process laventory 55.540 Manufacturing Overhead incurred $1.50 Subsidiary data for Work in Process Inventary on June 1 are at follows Job Cond Sheets Custoja Cost Eleme Fuler Direct materials 5 600 5 800 5900 Direct labor 320 SAD 400 Manufacturing overhead 675 2015 513320 During materials purchased on account were 55.900, and all were Additional overhead cons come of depreciation of equipment 200 cm of 5000 incurred on count A summary of materials requisition tips and time tickets for June show the follows Customer Materials Requisiti Sly The Tide Fowler 50 + Paco