oints eBook Print References Analytics Exercise 9-1 (Algo) Recently, Phil Harris, the production control manager at Brunswick, read an article on time-phased requirements planning.

image text in transcribedimage text in transcribed

oints eBook Print References Analytics Exercise 9-1 (Algo) Recently, Phil Harris, the production control manager at Brunswick, read an article on time-phased requirements planning. He was curious about how this technique might work in scheduling Brunswick's engine assembly operations and decided to prepare an example to illustrate the use of time-phased requirements planning. Phil's first step was to prepare a master schedule for one of the engine types produced by Brunswick: the Model 1000 engine. This schedule indicates the number of units of the Model 1000 engine to be assembled each week during the last 12 weeks and is shown on the next page. Next, Phil decided to simplify his requirements planning example by considering only two of the many components that are needed to complete the assembly of the Model 1000 engine. These two components, the gear box and the input shaft, are shown in the product structure diagram shown below. Phil noted that the gear box is assembled by the Subassembly Department and subsequently is sent to the main engine assembly line. The input shaft is one of several component parts manufactured by Brunswick that are needed to produce a gear box subassembly. Thus, levels 0, 1, and 2 are included in the product structure diagram to indicate the three manufacturing stages that are involved in producing an engine the Engine Assembly Department, the Subassembly Department, and the Machine Shop The manufacturing lead times required to produce the gear box and input shaft components are also indicated in the bill-of-materials diagram. Note that two weeks are required to produce a batch of gear boxes and that all the gear boxes must be delivered to the assembly-line parts stockroom before Monday morning of the week in which they are to be used. Likewise, it takes three weeks to produce a lot of input shafts, and all the shafts needed for the production of gear boxes in a given week must be delivered to the Subassembly Department stockroom before Monday morning of that week. In preparing the MRP example, Phil planned to use the worksheets shown the below and to make the following assumptions 1. Twenty gear boxes are on hand at the beginning of Week 1, and six gear boxes are currently on order to be delivered at the start of Week 2 2. Forty input shafts are on hand at the start of Week 1, and 24 are scheduled for delivery at the beginning of Week 2. Model 1000 master schedule. Week T 2 " 4 567 10 11 12 Demand 16 A " 10 15 20 10 N Crankcase Model 1000 bill-of-material Engine ssembly Gearbox Lead time-2 weeks Used: 3 per engine Trout thatt Lead time3 weeks Used 2 per gear box

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamental Accounting Principles Volume II

Authors: Larson Kermit, Jensen Tilly

14th Canadian Edition

71051570, 0-07-105150-3, 978-0071051576, 978-0-07-10515, 978-1259066511

More Books

Students also viewed these Accounting questions

Question

What role does the driver manager serve? AppendixLO1

Answered: 1 week ago

Question

2. Use different groups for different subjects.

Answered: 1 week ago

Question

What are the purposes of promotion ?

Answered: 1 week ago