Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

omir VakeAssment takeAssignmentMaindo?noker-asso nnen s8 takeAssignmer tesso nLocator'assinnent-take& npr ZO Calculate Lead Time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the

image text in transcribed
omir VakeAssment takeAssignmentMaindo?noker-asso nnen s8 takeAssignmer tesso nLocator'assinnent-take& npr ZO Calculate Lead Time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the treditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 30 parts. A part requires 5 minutes in miling and 7 minutes in finishing. The move time between the two operations for a complete batch is 5 minutes Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 4 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place Traditional Philosophy Lean Manufacturing Philosophy Value-added time min min min min Non-value-added time min %) Total lead time Value-added ratio (as a percent) 4.05 PM A. 4, 4/25/2018 DOLL

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions