optimization advance math optimization network model Math + Optimization Consider the following project with time measured in days and costs in thousand dollars. The minimum

optimization
image text in transcribed
advance math optimization network model
Math + Optimization Consider the following project with time measured in days and costs in thousand dollars. The minimum time can be achieved at maximum cost by obtaining additional resources. Normal Minimum Normal Maximum Activity Predecessors Time Time Cost Cost A None 14 12 15 17.5 B 14 11 55 64 B 8 5 50 75 NONE 12 9 40 50 BD 18 16 50 65 CE 20 16 40 55 E 14 10 55 70 FG 21 19 25 65 10 8 25 32 20 10 50 120 9 6 25 40 15 10 10 40 Imo> I-3 a) using the normal times, formulate a linear program to determine a start time for each activity that would minimize the project's total duration. Constrain all start times to be unrestricted in sign except for the dummy START activity which should have a nonnegative start time. Solve the created model using excel solver b) Create the Activity-On-Nodes Network for this project. c) Using exhaustive enumeration and normal times determine all critical paths for this project. Math + Optimization Consider the following project with time measured in days and costs in thousand dollars. The minimum time can be achieved at maximum cost by obtaining additional resources. Normal Minimum Normal Maximum Activity Predecessors Time Time Cost Cost A None 14 12 15 17.5 B 14 11 55 64 B 8 5 50 75 NONE 12 9 40 50 BD 18 16 50 65 CE 20 16 40 55 E 14 10 55 70 FG 21 19 25 65 10 8 25 32 20 10 50 120 9 6 25 40 15 10 10 40 Imo> I-3 a) using the normal times, formulate a linear program to determine a start time for each activity that would minimize the project's total duration. Constrain all start times to be unrestricted in sign except for the dummy START activity which should have a nonnegative start time. Solve the created model using excel solver b) Create the Activity-On-Nodes Network for this project. c) Using exhaustive enumeration and normal times determine all critical paths for this project

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Real Life Money An Honest Guide To Taking Control Of Your Finances

Authors: Clare Seal

1st Edition

1472272293, 978-1472272294

More Books

Students also viewed these Finance questions

Question

Is there a clear hierarchy of points in my outline?

Answered: 1 week ago