over the past decade, DoD has developed more estimates by engineering. The reason for this is that Acquisition Reform encourages DoD to let industry (contractor)
over the past decade, DoD has developed more estimates by engineering. The reason for this is that Acquisition Reform encourages DoD to let industry (contractor) retain detail design drawings as a cost savings measure.
- true
- false