Answered step by step
Verified Expert Solution
Question
1 Approved Answer
P11-55B Comprehensive standards and variances problem (Learning Objectives 1, 2, 3, 5, & 6) Nautical Awning manufactures awnings and uses a standard cost system. Nautical
P11-55B Comprehensive standards and variances problem (Learning Objectives 1, 2, 3, 5, & 6) Nautical Awning manufactures awnings and uses a standard cost system. Nautical allo- cates overhead based on the number of direct labor hours. The following are the com- pany's cost and standards data: Direct material 18.0 yards per awning at $10.00 per yard Direct labor 2.0 hours per awning at $13.00 per hour Variable MOH standard rate $5.00 per direct labor hour Predetermined fixed MOH standard rate $10.00 per direct labor hour Total budgeted fixed MOH cost $34,000 Actual cost and operating data from the most recent month follows: Purchased 35,460 yards at a total cost of $333,324 Used 31,300 yards in producing 1,800 awnings Actual direct labor cost of $45,457 for a total of 3,470 hours Actual variable MOH cost $19,085 Actual fixed MOH cost $39,500 All manufacturing overhead is allocated on the basis of direct labor hours. Requirements 1. Calculate the standard cost of one awning. 2. Calculate the following variances: a. The direct material variances. b. The direct labor variances. C. The variable manufacturing overhead variances. d. The fixed manufacturing overhead variances. 3. Explain what each of the variances you calculated means and give at least one possible explanation for each of those variances. Are any of the variances likely to be interrelated
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started