P6.37 Job costing; future versus current costs: engineering firm MJA Engineers is a firm of consulting engineers. The business provides two main services: design and

P6.37 Job costing; future versus current costs: engineering firm

MJA Engineers is a firm of consulting engineers. The business provides two main services: design and support services for civil engineering projects, such as the building of bridges and roads, and environmental assessments for planned and existing developments. MJA is preparing a tender for a project involving the extension of the main runway at Adelaide Airport. An initial feasibility study recommended extending the western boundary of the airport by either shifting the major arterial road on the western boundary or building an underpass for the road beneath the extended runway. The tender involves assessing the economic and environmental feasibility of each alternative.

MJA's tender manager is responsible for preparing tender bids. She estimates tender costs by identifying all costs that are likely to be directly associated with the project. To obtain the final tender bid, the total professional (engineering and scientific) labour costs are marked up by 75 per cent, and all other costs are marked up by 50 per cent. These margins are intended to cover any indirect costs plus provide the required profit margin on the project.

The tender manager estimated the following direct costs for the airport project:

Input Costs
Civil engineers 100 hours $21 000
Environmental scientists 80 hours 15 000
Support labour 100 hours 9 000
Travel 500 km 750
Computer time 40 hours 3 000
Photocopying, phone, tax 375

Required:

1. Estimate the tender bid for the project.

2. Estimate the profit on the project if the bid is successful and all costs are incurred as planned.

3. Once a project has begun, MJA will use a costing system that tracks all direct costs to projects. If the airport bid is successful, how would managers at MJA use this information?

4. Do you think there is likely to be any link between the costing system used to account for existing projects and the system that the tender manager uses to prepare bids for potential projects. Explain.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Managerial Accounting

Authors: Charles E. Davis, Elizabeth Davis

4th Edition

1119577667, 978-1119577669

More Books

Students also viewed these Accounting questions

Question

1. Too reflect on self-management

Answered: 1 week ago

Question

Food supply

Answered: 1 week ago