Answered step by step
Verified Expert Solution
Question
1 Approved Answer
PA 4-6 Atlas Inc. is a toy bicycle manufacturing... Atlas Inc. is a toy bicycle manufacturing company producing a five-inch small version of the bike
PA 4-6 Atlas Inc. is a toy bicycle manufacturing... Atlas Inc. is a toy bicycle manufacturing company producing a five-inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assemblyline at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here: . Step 1 (35 sec.): The plastic tube for the frame is cut to size. Step 2 (25 sec.): The tube is put together. Step 3 (35 sec.): The frame is glued together Step 4 (30 sec.): The frame is cleaned. Step 5 (25 sec.): Paint is sprayed onto the frame. Step 6 (45 sec.): Wheels are assembled. Step 7 (35 sec.): All other parts are assembled to the frame. . Under the current process layout, workers are allocated to the stations as shown here: Worker 1: Steps 1, 2 Worker 2: Steps 3, 4 Worker 3: Step 5 Worker 4: Step 6 Worker 5: Step 7 Assume the workers are paid $15 per hour. Each bicycle is sold for $5 and includes parts that are sourced for $1. The company has fixed costs of $225 per hour. Despite Lance Armstrong's doping confession, there exists substantially more demand for the bicycle than Atlas can supply. Instructions: Carry at least 4 decimal places in all intermediate calculations and values. Round (only) your final answers to 2 decimal places. Negative amounts should be indicated by a minus sign. What is the cost of direct labor for the bicycle? a. per unit b. How much profit does the company make per hour? per hour What would be the profits per hour if Atlas would be able to source the parts 11% c. cheaper ($0.89 for the parts of one unit, but the fixed costs and productivity will remain same as before)? per hour What would be the profits per hour if Atlas d. would be able to reduce fixed costs by 12% (to $198.00 per hour)? per hour What would be the profits per hour if Atlas would be able to reduce the processing time at the bottleneck by 3 seconds per unit e. (assume unlimited demand, note that reducing the processing time may cause the bottleneck to shift to a different process or create multiple, identical bottlenecks)? per hour
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started