Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

PA4-2 (Algo) Assigning Costs Using Traditional System, Assigning Costs Using Activity Proportions [LO 4-1, 4-3, 4-5, 4-6] Carlise Corp., which manufactures ceiling fans, currently

image text in transcribedimage text in transcribedimage text in transcribed

PA4-2 (Algo) Assigning Costs Using Traditional System, Assigning Costs Using Activity Proportions [LO 4-1, 4-3, 4-5, 4-6] Carlise Corp., which manufactures ceiling fans, currently has two product lines, the Indoor and the Outdoor. Carlise has total overhead of $125,250. Carlise has identified the following information about its overhead activity cost pools and the two product lines: Activity Cost Pools Materials handling Quality control Machine maintenance Cost Driver Number of moves Number of inspections Cost Assigned to Pool $ 17,480 $ 76,230 Number of machine hours $ 31,540 Quantity/Amount Consumed by Indoor Line 630 moves 5,600 inspections 29,000 machine hours Quantity/Amount Consumed by Outdoor Line 290 moves 4,300 inspections 9,000 machine hours Required: 1. Suppose Carlise used a traditional costing system with machine hours as the cost driver. Determine the amount of overhead assigned to each product line. (Do not round intermediate calculations and round your final answers to the nearest whole dollar amount.) Indoor Model Outdoor Model Total Overhead Assigned 2. Calculate the activity proportions for each cost pool in Carlise's ABC system. (Round your answers to 2 decimal places.) Activity Proportions Indoor Line Outdoor Line Materials Handling % % per Move Quality Control Machine maintenance % per Inspection % per Machine Hour 3. Calculate the amount of overhead that Carlise will assign to the Indoor line if it uses an ABC system. (Round your intermediate calculations to 2 decimal places and round your final answers to the nearest whole dollar amount.) Indoor Model Materials Handling Quality Control Machine maintenance Total Overhead Assigned 3. Calculate the amount of overhead that Carlise will assign to the Indoor line if it uses an ABC system. (Round your intermediate calculations to 2 decimal places and round your final answers to the nearest whole dollar amount.) Indoor Model Materials Handling Quality Control Machine maintenance Total Overhead Assigned 4. Determine the amount of overhead Carlise will assign to the Outdoor line if it uses an ABC system. (Round your intermediate calculations to 2 decimal places and round your final answers to the nearest whole dollar amount.) Outdoor Model Materials Handling Quality Control Machine maintenance Total Overhead Assigned 5. Compare the results for a traditional system with an ABC system. Which do you think is more accurate? O Traditional System O ABC System

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Cost Accounting A Managerial Emphasis

Authors: Charles T. Horngren, Srikant M. Datar, Madhav V. Rajan

15th edition

978-0133428858, 133428850, 133428702, 978-0133428704

More Books

Students also viewed these Accounting questions

Question

What is the measure of reliability of a confidence interval?

Answered: 1 week ago

Question

Define Scientific Management

Answered: 1 week ago

Question

Explain budgetary Control

Answered: 1 week ago

Question

Solve the integral:

Answered: 1 week ago

Question

What is meant by Non-programmed decision?

Answered: 1 week ago