paraphase text: Under, Pursuant 27 CCR 20240(c), the landfill is required to be built with a minimum of 5 ft isolation between the waste and
paraphase text: Under, Pursuant 27 CCR 20240(c), "the landfill is required to be built with a minimum of 5 ft isolation between the waste and the anticipated maximum elevation of underlying groundwater" [4]. When considering 27 CCR 20240(c), it would be conservative to have a planned excavation depth of 185 ft [4]