Part 1- Anuwer all averstiens memplatdy (2li paints) 1. What ane three (3) types of imentoties? 2. What is the difference between dependent demand and independent dentind? 3. What is the difference between a PUSH system and a PULL sysem in manufacturing? 4. What is a Lean Prodaction System? 5. What ae four (4) types of waste in a production system? 6. What aee the primary responsibilities of a progect inamager? 7. Explain the difference between critical activities, slack time, and critical pud in a CPM analysis? 8. What are the seven (7) Dimenuioes of Quality with mgand to manufictand poods? 9. Who is responsible for the 14 Prineiples of Quality? 10- What are the five (5) major elements of TQM? 11-How does perceived wanting time differ from actal waiting time? 12. What is supply chain management? 13. What are five (5) costs along the supply chain? Explain each. 14. What are theee (3) supply chain strategies? Pant II- Problems and Fuay a Ancwer two oth gerstians in this gert oMe painse) 1. Ecenomie Order Quantity A pipe munufacturer requives a chemical for muking plastic at the rate of 6000 gallons per year. The cost of kecping the chemical sacage is 510 per gallon por year. Oedering costs ate 5300 per erder. The chemical is besghts at 545 per gallen. What is the EOQ and the Annal Toal Coat? 2. Quality Coatrol Charts A local brewery and botling plant want so kecp track of the bottling filling equipment's accuracy, Bottliss are to be filled with ctactly 16 ousces of the drink. The following is data from the boeling equipenent where 5 sarples of boteles filled were pulled every bour and meabered for actual peantity fillod Draw an X-Bar clant and a R chart. I this filling proeess in control or out of conteol? (4) =5:A2=0.58,D3=0,D4=2.11 End of Midterm Exam