Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

PART 1 Fixed and Variable Cost Determinations Unit Cost Calculations The projected cost of a lamp is calculated based upon the projected increases or decreases

PART 1
Fixed and Variable Cost Determinations
Unit Cost Calculations
The projected cost of a lamp is calculated based upon the projected increases or decreases to
current costs. The present costs to manufacture one lamp are:
Lamp Kit: $16.0000000 per lamp
Direct Labor: 2.0000000 per lamp (4 lamps/hr.)
Variable Overhead: 2.0000000 per lamp
Fixed Overhead: 10.0000000 per lamp (based on normal capacity of 25,000 lamps)
Cost per lamp: $30.0000000 per lamp
Expected increases for 20x2
When calculating projected increases round to TWO ($0.00) decimal places.
1. Material Costs are expected to increase by 6.00% .
2. Labor Costs are expected to increase by 3.00%.
3. Variable Overhead is expected to increase by 4.00%.
4. Fixed Overhead is expected to increase to $275,000.
5. Fixed Administrative expenses are expected to increase to $56,000.
6. Variable selling expenses (measured on a per lamp basis) are expected to increase
by 2.00%.
7. Fixed selling expenses are expected to be $23,000 in 20x2.
8. Variable administrative expenses (measured a per lamp basis) are expected to
increase by 6.00%.
On the following schedule develop the following figures:
1- 20x2 Projected Variable Manufacturing Unit Cost of a lamp.
2- 20x2 Projected Variable Unit Cost per lamp.
3- 20x2 Projected Fixed Costs.

I See The Light, Inc
Schedule of Projected Costs
Variable Manufacturing Unit Cost
20x1 Cost Projected Percent Increase 20x2 Cost Rounded to 2 Decimal Places
Lamp Kit {4.01}
Labor {4.02}
Variable Overhead {4.03}
Projected Variable Manufacturing Cost Per Unit {4.04}
Total Variable Cost Per Unit
20x1 Cost Projected Percent Increase 20x2 Cost Rounded to 2 Decimal Places
Variable Selling {4.05}
Variable Administrative {4.06}
Projected Variable Manufacturing Unit Cost {4.04}
Projected Total Variable Cost Per Unit {4.07}
Schedule of Fixed Costs
20x1 Cost Projected Percent Increase 20x2 Cost
Fixed Overhead {4.08}
(normal capacity of _________ lamps @ __ )
Fixed Selling {4.09}
Fixed Administrative {4.10}
Projected Total Fixed Costs {4.11}

ANSWER 4.01-4.11 with information given

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Auditing A Practical Approach

Authors: Robyn Moroney, Fiona Campbell, Jane Hamilton, Valerie Warren

1st Extended Canadian Edition

1118878418, 9781118878415

More Books

Students also viewed these Accounting questions