Part 3 - Dual Card Kanban (15 points) The bill of materials (BOM) for an assembly is shown below (numbers in parentheses indicate the quantity

image text in transcribed

Part 3 - Dual Card Kanban (15 points) The bill of materials (BOM) for an assembly is shown below (numbers in parentheses indicate the quantity of each part within each assembly, e.g., the assembly includes 3-part Cs). Each 8-hour day, the assembly line produces 500 units. During the 8-hour day, workers have a 30-minute paid lunch and two breaks of 15 minutes each. Because the assembly line is located in a different area of the plant from where parts A, B, and C are produced, a two-card pull Kanban system is used. If a safety margin of 20% is to be maintained, how many of each of the withdrawal and production cards are needed? Draw a schematic diagram showing the assembly and parts production areas, and the location of the containers and cards. Information for producing/moving the parts is below. Assembly 100 1.25 B 50 1.5 100 1.0 A (2) B (1) C (3) Container size (units) Conveyance time (hours/container) Production time (minutes/container) 30 45 55 Part 3 - Dual Card Kanban (15 points) The bill of materials (BOM) for an assembly is shown below (numbers in parentheses indicate the quantity of each part within each assembly, e.g., the assembly includes 3-part Cs). Each 8-hour day, the assembly line produces 500 units. During the 8-hour day, workers have a 30-minute paid lunch and two breaks of 15 minutes each. Because the assembly line is located in a different area of the plant from where parts A, B, and C are produced, a two-card pull Kanban system is used. If a safety margin of 20% is to be maintained, how many of each of the withdrawal and production cards are needed? Draw a schematic diagram showing the assembly and parts production areas, and the location of the containers and cards. Information for producing/moving the parts is below. Assembly 100 1.25 B 50 1.5 100 1.0 A (2) B (1) C (3) Container size (units) Conveyance time (hours/container) Production time (minutes/container) 30 45 55

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Accounting A Valuation Emphasis

Authors: John S. Hughes, Frances L. Ayres, Robert E. Hoskin

1st Edition

0471203599, 978-0471203599

More Books

Students also viewed these Accounting questions

Question

Develop successful mentoring programs. page 418

Answered: 1 week ago