Part A: 50% For this week's individual assignment, prepare a 5point summary of the key options available under each type of Contract below. Use separate heading for each type of contract. As a minimum, you shall address the contract relation, the role \& responsibility and risk exposure of the Owner and the Contractor(s) - CCDC 17, 2010:Stipulated Price Contract Between Owner and Trade Contractor for Construction Management Projects 20 pts - CCDC 5A, 2010: Construction Management Contract - for Services: 20 pts - CCDC 5B - 2010: Construction Management Contract - for Services and Construction: 10 pts - Examine the drawing and construction notes package for "80 Center Street." (i.e. you do not have to know everything in detail to be able to answer the questions, but you need to see the scope of information provided) - Here is the scenario: - You are a Construction Manager. - You have been asked by the Owner, a friend of yours, how to get this small office building constructed "as soon as possible,...I have no office space for my staff to work out of." - The City has told you that the building has to be built of "incombustible construction" but the architect's drawings show a wood frame building. So they must change to a lightweight metal framing system (see guide provided...fundamentally lightweight metal uses the same framing techniques as wood). See CSSBI's "Lightweight Steel Framing, Architectural Design Guide." - The basement is a poured concrete structure. Answer these questions: 1. What would you advise your friend to do regarding getting this project built "ASAP?" and the reasons why ( 50 words max) 20 pts 2. What form of Project Delivery method of the five methods we have covered thus far would you propose to assist your friend? 10 pts 3. What is the basis of your proposal above? (at least three bullet points) 10 pts 4. How would you proceed? (list five steps in point form) 10 pts Part A: 50% For this week's individual assignment, prepare a 5point summary of the key options available under each type of Contract below. Use separate heading for each type of contract. As a minimum, you shall address the contract relation, the role \& responsibility and risk exposure of the Owner and the Contractor(s) - CCDC 17, 2010:Stipulated Price Contract Between Owner and Trade Contractor for Construction Management Projects 20 pts - CCDC 5A, 2010: Construction Management Contract - for Services: 20 pts - CCDC 5B - 2010: Construction Management Contract - for Services and Construction: 10 pts - Examine the drawing and construction notes package for "80 Center Street." (i.e. you do not have to know everything in detail to be able to answer the questions, but you need to see the scope of information provided) - Here is the scenario: - You are a Construction Manager. - You have been asked by the Owner, a friend of yours, how to get this small office building constructed "as soon as possible,...I have no office space for my staff to work out of." - The City has told you that the building has to be built of "incombustible construction" but the architect's drawings show a wood frame building. So they must change to a lightweight metal framing system (see guide provided...fundamentally lightweight metal uses the same framing techniques as wood). See CSSBI's "Lightweight Steel Framing, Architectural Design Guide." - The basement is a poured concrete structure. Answer these questions: 1. What would you advise your friend to do regarding getting this project built "ASAP?" and the reasons why ( 50 words max) 20 pts 2. What form of Project Delivery method of the five methods we have covered thus far would you propose to assist your friend? 10 pts 3. What is the basis of your proposal above? (at least three bullet points) 10 pts 4. How would you proceed? (list five steps in point form) 10 pts