Question
Part (i) Light Industries Ltd produces two types of flashlights: Regular and Deluxe. Three activities have been identified in the production process: set-ups, machining and
Part (i)
Light Industries Ltd produces two types of flashlights: Regular and Deluxe. Three activities have been identified in the production process: set-ups, machining and packing. Resource drivers have been used to assign costs to each activity. The overhead rates, their costs and other related data follows:
Product
Machine hours
Set-ups
Packing orders
Regular
2,000
100
600
Deluxe
3,000
400
2,400
Cost
$50,000
$4,000
$8,000
- Classify the overhead activities as unit-level, batch-level, product-level or facility- level.
- Identify the most appropriate activity driver for each pool and compute the pool rate.
- Assign the overhead costs to each product using the pool rates computed in requirement B.
Part (ii)
Baker Manufacturing Ltdhas four categories of overheads. The four categories
and the expected overhead costs for each category for next year are as follows:
$
Maintenance
140,000
Materials handling
60,000
Set-ups
50,000
Inspection
100,000
Currently, overheads are applied using a predetermined overhead rate based upon budgeted direct labour hours. For next year, 50,000 direct labour hours are budgeted.
The company has been asked to submit a bid for a proposed job. The factory manager feels that obtaining this job would result in new business in future years. Usually bids are based upon full manufacturing cost plus 30%.
Estimates for the proposed job are as follows:
Direct materials
$5,000
Direct labour (750 hours)
$7,500
Number of materials moves
8
Number of inspections
5
Number of set-ups
3
Number of machine hours
300
In the past, full manufacturing cost has been calculated by allocating overheads using a volume-based cost driver - direct labour hours. The factory manager has heard of a new way of applying overhead that uses cost pools and cost drivers.
Expected activity for the four activity-based cost drivers that would be used are as follows:
Machine hours
16,000
Material moves
4,000
Set-ups
2,000
Quality inspections
8,000
Required:
A.
Determine the amount of overheads that would be allocated to the proposed job if direct labour hours are used as the volume-based cost driver.
Determine the total cost of the proposed job.
Determine the company's bid if the bid is based upon full manufacturing cost plus 30%.
B.
Determine the amount of overheads that would be applied to the proposed job if activity-based costing is used.
Determine the total cost of the proposed job if activity-based costing is used.
Determine the company's bid if activity-based costing is used and the bid is based upon full manufacturing cost plus 30%.
C.
Which product costing method produces the more competitive bid?
D.
Briefly discuss the reasons why activity based costing system might be preferred to functional or conventional costing systems.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started