PART-3 (20 marks) Q12. Asyad Group is working with Oman Rail to create a transportation network for the country's mineral resources ("Mineral Line). The source will be the Al Wusta and Dhofar governorates and the destination will be Al Duqm. Create a risk register for this project including the risk matrix and the risk response type for each of the risks mentioned below. Explanation must be provided for each choice made. (10 marks) Risk index Risk Magnitude 20-25 Maximum 15-19 High 10-14 Medium 5-9 Low 1-4 Minimum Table 2: Risk matrix data for Q12 a) A country-wide lockdown makes it impossible for the office staff to reach the site. [2] b) Delay of material delivery because of airport shutdown due to the pandemic. [2] c) A high rate of infection that might raise the project cost and lower utilization. [2] d) Extra safety measures because of COVID-19 that require PPE, sanitization and social distancing for all the employees at site. e) The end-result may not exactly be what is desired by the owner. [2] [2] PART-3 (20 marks) Q12. Asyad Group is working with Oman Rail to create a transportation network for the country's mineral resources ("Mineral Line). The source will be the Al Wusta and Dhofar governorates and the destination will be Al Duqm. Create a risk register for this project including the risk matrix and the risk response type for each of the risks mentioned below. Explanation must be provided for each choice made. (10 marks) Risk index Risk Magnitude 20-25 Maximum 15-19 High 10-14 Medium 5-9 Low 1-4 Minimum Table 2: Risk matrix data for Q12 a) A country-wide lockdown makes it impossible for the office staff to reach the site. [2] b) Delay of material delivery because of airport shutdown due to the pandemic. [2] c) A high rate of infection that might raise the project cost and lower utilization. [2] d) Extra safety measures because of COVID-19 that require PPE, sanitization and social distancing for all the employees at site. e) The end-result may not exactly be what is desired by the owner. [2] [2]