Planning, Scheduling, and Control BLDG 2021 Scheduling Project - Village Administration Building Expansion Group Project: 30% of Overall Grade For this assignment you are required

Planning, Scheduling, and Control BLDG 2021 Scheduling Project - Village Administration Building Expansion Group Project: 30% of Overall Grade For this assignment you are required to work and develop a detailed project schedule for the Village Administration Building Expansion plans. Use the posted pdf drawings. DELIVERABLES: Schedule the project preconstruction commencing on April 10, 2024 and total completion by January 15, 2025 Any National Holidays that cross your project should be scheduled as non-working days. Need to use a resource sheet that displays all resources allocated to the project You must apply all of the costs All executable activities have resources assigned to them. Remember nothing gets built without resources Provide a suitable WBS for the project. Refer to the examples in the course textbook as a guide For this assignment ensure that your tasks are structured such that they would correspond with a payment schedule that you would have set up with you different subcontract agreements. Make sure that you structure the accruals to correspond appropriately. This applies for resources If you make an assumption and you wish to clarify - include it in a note beside the activity Overall as a guide the cost can be approximated at $2,000 per square meter based on outside foundation wall measurement. There should be no resource over allocations showing on the final project. The project should be scheduled in the most efficient manner, taking advantage of lead, lag, and concurrent scheduling while converting your estimated work hours to duration. Once you complete the schedule and have all cost loaded set the baseline. Make sure that when you view your project that it makes sense, e.g. no activities left hanging

REFERENCE TUTORIALS: Tutorial 5 Updating a Schedule https://youtu.be/YtTYfXA1b58 Tutorial 7 Adding a Change https://youtu.be/LIrPbndPiPU Tutorial 8 File Saving Protocol https://youtu.be/XJSF5T4Eogc SUBMISSION DOCUMENTS: COMPLETE ON 1. The completed file MsProject baseline

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project Management Fundamentals Key Concepts And Methodology

Authors: Gregory T. Haugan

2nd Edition

1567262813, 9781567262810

More Books

Students also viewed these General Management questions

Question

Show that, in a multiple linear regression dataset, h = p.

Answered: 1 week ago