Question
PLC.. B) Program using LADER the following sequence of operations as part of an industrial process. For S7-1200 Siemens PLC (CPU 1215C) with SM 1234
PLC..
B) Program using LADER the following sequence of operations as part of an industrial process. For S7-1200 Siemens PLC (CPU 1215C) with SM 1234 AI/AQ expansion module
-When start pushbutton is pressed, the belt begins its movement in a forward direction.
-The movement stops when the sensor S1 detects the bottle.
-At this instant, valve 1 and valve 2 open allowing material 1 and material 2 to be poured into the mixer chamber. This process continues for 3 seconds.
-Directly after that, the mixer and heater starts its running that continues until the temperature become 50 C which selected by potentiometer.
-After that the mixer and heater stop, and valve 3 opens for 6 seconds allowing the mixed material to be poured in the bottle.
- Then the belt will work again to drop the bottle in the box
-After that, the process recycles.
- After 10 pieces, the task stops and waits to restart it.
- You can stop the task whenever you want
-Determine the potentiometer value to give 50 C.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started