Please answer 6,7,8,9,10,11,12 please with explanation. Thank you!
Whiskey Distillery Your professor wants to have his own rye whiskey distillery. Here are the options to do so. Since you are a good student, he asks you to decide for him which is best? A S10.K B $15.K Units USD Options: Installed cost: Uniform annual benefit: Useful life: S1.6K $1.5K USD Years 10 20 The salvage value at the end of the useful life of each alternative is zero. semiannually, compounded weekly. Evaluate at 2.449 Costs for Rebuilding Cold Mountain 200 150 160 140 120 100 80 50 40 20 0 12.57 The folks at the Community Town Association asked me to repair and infill tunnels in Cold Mountain. Above are estimated costs [SM]. What is the equivalent annual for costs at my standard rate of 10%? In case you can't tell, the costs increase by 10% per year after year 2. They will pay me 51630M in year 8, calculate the ROR in the old method ((Revenue Costs) Cost) and by the correct (according to my finance guys) method of ROR analysis (IRR). Community Town Association of the Lower Belt of San Angelica de Sebastian These people need an aqueduct for water supply. Which option is best if evaluated at 5%? . McDuck Mountain Tunnel: Construction cost: S5.5M. Annual maintenance: SIOK. Lifetime: should last forever. Scrooge Mountain Pipeline: Construction cost: 54.5M. Annual maintenance: S15K, Lifetime: 30 years. Annual maintenance: $15K. Lifetime:30 years. 6.2.44% per semiannual period, compounded weekly when converted to effective yearly is 7. The AW for costs to refill Cold Mountain is 8. What is the difference between the ROR calculated by (Made-Cost)/Cost and the ROR done from analysis of a cash flow (IRR)? A IRR Is the amount of return or rate of return per year. ROR is just a flat amount of made ys.spent. B ROR is amount per year and IRR is the rate of return for how much it cost to start the project. CEL(PU D There is no difference. EIRR is decided by the central bank and the loan amount but ROR does not account for debt rate. 9. The best Rye Whiskey distillery option is at A. $3693 B. $2550 C. $1550 D. $3055 E. $1680 A Option A B Option B c Option C D Option B and A are equivalent E Option C and A are equivalent 10. Because the PW for the best option LCM 1 11. To provide water to the Lower Belt of San Angelica de Sebastian you choose 1.A MsDuck Tunnel 1.B Scrooge Pipeline 1.C They are equivalent 1.D N/A, cannot be determined 12. The AW equivalent costs for McDuck Tunnel is option a.AW is $275K b.AW is $285K c.AW is $307K d.AW is $560K e.AW is $1.2M Whiskey Distillery Your professor wants to have his own rye whiskey distillery. Here are the options to do so. Since you are a good student, he asks you to decide for him which is best? A S10.K B $15.K Units USD Options: Installed cost: Uniform annual benefit: Useful life: S1.6K $1.5K USD Years 10 20 The salvage value at the end of the useful life of each alternative is zero. semiannually, compounded weekly. Evaluate at 2.449 Costs for Rebuilding Cold Mountain 200 150 160 140 120 100 80 50 40 20 0 12.57 The folks at the Community Town Association asked me to repair and infill tunnels in Cold Mountain. Above are estimated costs [SM]. What is the equivalent annual for costs at my standard rate of 10%? In case you can't tell, the costs increase by 10% per year after year 2. They will pay me 51630M in year 8, calculate the ROR in the old method ((Revenue Costs) Cost) and by the correct (according to my finance guys) method of ROR analysis (IRR). Community Town Association of the Lower Belt of San Angelica de Sebastian These people need an aqueduct for water supply. Which option is best if evaluated at 5%? . McDuck Mountain Tunnel: Construction cost: S5.5M. Annual maintenance: SIOK. Lifetime: should last forever. Scrooge Mountain Pipeline: Construction cost: 54.5M. Annual maintenance: S15K, Lifetime: 30 years. Annual maintenance: $15K. Lifetime:30 years. 6.2.44% per semiannual period, compounded weekly when converted to effective yearly is 7. The AW for costs to refill Cold Mountain is 8. What is the difference between the ROR calculated by (Made-Cost)/Cost and the ROR done from analysis of a cash flow (IRR)? A IRR Is the amount of return or rate of return per year. ROR is just a flat amount of made ys.spent. B ROR is amount per year and IRR is the rate of return for how much it cost to start the project. CEL(PU D There is no difference. EIRR is decided by the central bank and the loan amount but ROR does not account for debt rate. 9. The best Rye Whiskey distillery option is at A. $3693 B. $2550 C. $1550 D. $3055 E. $1680 A Option A B Option B c Option C D Option B and A are equivalent E Option C and A are equivalent 10. Because the PW for the best option LCM 1 11. To provide water to the Lower Belt of San Angelica de Sebastian you choose 1.A MsDuck Tunnel 1.B Scrooge Pipeline 1.C They are equivalent 1.D N/A, cannot be determined 12. The AW equivalent costs for McDuck Tunnel is option a.AW is $275K b.AW is $285K c.AW is $307K d.AW is $560K e.AW is $1.2M