Please Answer All Parts Lopez Company produces two subassemblies, JR-14 and RM-13, used in manufacturing trucks. The company is currently using the traditional costing system
Please Answer All Parts
Lopez Company produces two subassemblies, JR-14 and RM-13, used in manufacturing trucks. The company is currently using the traditional costing system that applies overhead based on DL hours. The budget for the current year ended December 31, 2021 is as follows:
On January 1, 2022 Lopez Co, is planning to increase the prices of JR-14 to $355 and RM-13 to $455. Material cost are not expected to increase in 2022, but DL will increase by 8% and all MOH will increase by 6%. Due to the nature of the manufacturing process, the company does not have any beginning or ending work in process inventories.
Required:
Using activity-based costing, calculate the total cost in 20x2 for the following activity cost pools: machining, assembly, material handling, and inspection.
Calculate the pool rate / POH per unit of the appropriate cost driver for each of the four activities
Prepare a table showing for each product line the estimated 20x2 cost for each of the following cost elements: direct material, direct labor, machining, assembly, material handling and inspection.
Complete the budgeted statement showing the gross margin for Lopez Company for 20x2, using activity-based costing. The statement should show each product and a total for the company. Be sure to include detailed calculations for the cost of goods manufactured and sold. (HINT: I have started the format for you)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started