Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Please answer question 3 1 (35 Pts). Probability of success - Consider the network configuration below with three incoming attacks A1, A2, and A3; two
Please answer question 3
1 (35 Pts). Probability of success - Consider the network configuration below with three incoming attacks A1, A2, and A3; two weaknesses W1 and W2; and three controls C1, C3, C3. A1 C1 A2 W1 W2 C2 A3 C3 For the attack to be successful any of the Attacks 1, 2, or 3 must penetrate W1 and W2, and avoid controls 1, 2, or 3. Assume probabilities over interval of 1 hour for attack P(A1) = 1, P(A2)=25, P(A3) = .15. Assume probabilities of success on weakness for 1 hour as P(W1)= .7, P(W2)=.4 Assume probabilities of avoiding controls for 1 hour as P(C1)=.15, P(C2)=.1, P(C3)=.2 Compute the overall probability of success of the adversary 2 (25 Pts). Impact Assessment Consider the simplified model for risk shown in class. Assume the following parameters 1 = .8/day, 22 = .3 days, 2 3 = 2 days, 24 = 5 days Assume Time intervals T2 = 1 day, T3 = 1day. Assume assets of $ 1.1 million. a. Compute the Risk per day. b. Modify elements you as a designer might control to adjust the risk to $.01 Million/day 3 (40 Pts). Develop a Monte Carlo simulation of the Risk model developed in class. Assume the variables as in problem 2. Plot the model variables for increments of 10 minutes over the 24 hour day to demonstrate the successful modeling. 1 (35 Pts). Probability of success - Consider the network configuration below with three incoming attacks A1, A2, and A3; two weaknesses W1 and W2; and three controls C1, C3, C3. A1 C1 A2 W1 W2 C2 A3 C3 For the attack to be successful any of the Attacks 1, 2, or 3 must penetrate W1 and W2, and avoid controls 1, 2, or 3. Assume probabilities over interval of 1 hour for attack P(A1) = 1, P(A2)=25, P(A3) = .15. Assume probabilities of success on weakness for 1 hour as P(W1)= .7, P(W2)=.4 Assume probabilities of avoiding controls for 1 hour as P(C1)=.15, P(C2)=.1, P(C3)=.2 Compute the overall probability of success of the adversary 2 (25 Pts). Impact Assessment Consider the simplified model for risk shown in class. Assume the following parameters 1 = .8/day, 22 = .3 days, 2 3 = 2 days, 24 = 5 days Assume Time intervals T2 = 1 day, T3 = 1day. Assume assets of $ 1.1 million. a. Compute the Risk per day. b. Modify elements you as a designer might control to adjust the risk to $.01 Million/day 3 (40 Pts). Develop a Monte Carlo simulation of the Risk model developed in class. Assume the variables as in problem 2. Plot the model variables for increments of 10 minutes over the 24 hour day to demonstrate the successful modelingStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started