Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Please answer questions 1-4 for question 4 explain why you agree. Vance Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings.

Please answer questions 1-4 for question 4 explain why you agree.

image text in transcribedimage text in transcribedimage text in transcribed Vance Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings. The company's estimator has been involved in a long-simmering dispute with the on-site work supervisors. The on-site supervisors claim that the estimator does not adequately distinguish between routine work, such as removal of asbestos insulation around heating pipes in older homes, and non-routine work, such as removing asbestos-contaminated ceiling plaster in industrial buildings. The on-site supervisors believe that nonroutine work is far more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way: "My job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square metres by $4,000 per thousand square metres to determine the bid price. Since our average cost is only $3,000 per thousand square metres, that leaves enough cushion to take care of the additional costs of non-routine work that shows up. Besides, it is difficult to know what is routine or not routine until you actually start tearing things apart." To shed light on this controversy, the company initiated an ABC study of all of its costs. Data from the ABC system follow: 1. Using [ [] Exhibit 7-7 as a guide, perform the first-stage allocation of costs to the activity cost pools. 2. Using [ Exhibit 7-8 as a guide, compute the activity rates for the activity cost pools. 3. Using the activity rates you have computed, determine the total cost and the average cost per thousand square metres of each Page 280 of the following jobs according to the ABC system: a. A routine 2,000-square-metre asbestos removal job. b. A routine 4,000-square-metre asbestos removal job. c. A non-routine 2,000-square-metre asbestos removal job. 4. Given the results you obtained in (3) above, do you agree with the estimator that the company's present policy for bidding on jobs is adequate

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Managerial Accounting

Authors: Stacey Whitecotton, Robert Libby, Fred Phillips

5th Edition

1264467206, 978-1264467204

More Books

Students also viewed these Accounting questions