Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

please answrr all parts Required information The following information applies to the questions displayed below.) Sweeten Company had no jobs in progress at the beginning

image text in transcribedplease answrr all parts
image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
Required information The following information applies to the questions displayed below.) Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two jobs during the yearJob P and Job Q. The company uses a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, it estimated that 4,000 machine-hours would be required for the period's estimated level of production. Sweeten also estimated $33,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $3.70 per machine-hour. Because Sweeten has two manufacturing departments-Molding and Fabrication-it is considering replacing its plantwide overhead rate with departmental rates that would also be based on machine-hours. The company gathered the following additional information to enable calculating departmental overhead rates: Molding Fabrication Total Estimated total machine-hours used 2,500 1,500 4,000 Estimated total fixed manufacturing overhead $ 15,000 $ 18,000 $ 33,000 Estimated variable manufacturing overhead per machine-hour $ 3.40 $ 4.20 The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows: Job P Job o Direct materials $ 33,000 $ 18,000 Direct labor cost $ 37,000 $ 15,500 Actual machine-hours used Molding 3,700 2,800 Fabrication 2,600 2,900 Total 6,300 5,700 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9.15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments, 33.000 $ 37,000 18,0 $ 15,500 Direct materia15 Direct labor cost Actual machine-hours used: Molding Fabrication Total 3,700 2,600 6,300 2,800 2,900 5,700 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. 2. How much manufacturing overhead was applied to Job P and how much was applied to Job Q? (Do not round intermediate calculations.) Job P JobQ Manufacturing overhead applied additional information to enable calculating departmental overhead rates: Molding Fabrication Total Estimated total machine-hours used 2,500 1,500 4,000 Estimated total fixed manufacturing overhead $ 15,000 $ 18,000 $ 33,000 Estimated variable manufacturing overhead per machine-hour $ 3.40 $ 4.20 The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows: Job P $ 33,000 $ 37,000 Job $ 18,000 $ 15,500 Direct materials Direct labor cost Actual machine-hours used: Molding Fabrication Total 3,700 2,600 6,300 2,800 2,900 5.700 Sweeten Company had no overapplied or underapplied manufacturing overhead costs duri the year Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. 3. What is the total manufacturing cost assigned to Job P? (Do not round intermediate calculations. Round your final answer to nearest whole dollar.) Total manufacturing cos! additional information to enable calculating departmental overhead rates: Molding 2,500 $ 15,000 $ 3.40 Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-bour Fabrication 1,500 $ 18,000 $ 4.20 Total 4,000 $ 33,000 The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows: Job P $ 33,000 $ 37,000 Job O $ 18,000 $ 15,500 Direct materials Direct labor cost Actual machine-hours used: Molding Fabrication Total 3,700 2,600 6,300 2,800 2,900 5,700 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. 4. If Job Pincludes 20 units, what is its unit product cost? (Do not round Intermediate calculations. Round your final answer to nearest whole dollar.) Unit product cost overhead rate with departmental rates that would also be based on machine-hours. The company gathered the folle additional Information to enable calculating departmental overhead rates: Molding Fabrication Total Estimated total machine-hours used 2,500 1,500 4,000 Estimated total fixed manufacturing overhead $ 15,000 $ 18,000 $ 33,000 Estimated variable manufacturing overhead per machine-hour $ 3.40 $ 4.20 The direct materials cost, direct labor cost, and machine hours used for Jobs P and Q are as follows: Job P $ 33,000 $ 37,000 Job o $ 18,000 $ 15,500 Direct materials Direct labor cost Actual machine-hours used: Molding Fabrication Total 3,700 2,600 6.300 2,800 2,900 5,700 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-ho the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rate machine-hours as the allocation base in both departments. 5. What is the total manufacturing cost assigned to Job Q? (Do not round intermediate calculations.) Total manufacturing cost Molding Fabrication Total 3,700 2,600 6,300 2,800 2.900 5,700 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. 6. If Job Q includes 30 units, what is its unit product cost? (Do not round intermediate calculations. Round your final answer to nearest whole dollar.) Unit product cast

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Cost Determination A Conceptual Approach

Authors: Joel S. Demski

1st Edition

0813803608, 978-0813803609

More Books

Students also viewed these Accounting questions