Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Please check the answer at the bottom of the question before posting your answer. Don't post wrong answer . Thank you PROBLEM 7 (MAKE OR
Please check the answer at the bottom of the question before posting your answer. Don't post wrong answer. Thank you
PROBLEM 7 (MAKE OR BUY) A company at present has been buying a component called 'X', used in its finished product. Purchasing cost of component X is Rs. 10 per unit. The company has a normal capacity of 40,000 machine hours, and the budgeted fixed cost for the period is Rs. 1,60,000. The sales price of finished product is Rs. 100 per unit. The detailed manufacturing cost of one unit of finished product at normal capacity is as under: Direct Material (Including Component x) Rs. 50.00 Direct Labour (2 hrs. @ Rs. 8) Rs. 16.00 Manufacturing Overhead Cost (1 Machine hr. @ Rs. 10) Rs. 10.00 Total Rs. 76.00 Direct material cost of the company includes cost of four units of component X used in the finished product. The company has been considering to manufacture its own component X. The product designing department has prepared the following estimation of cost of producing one unit of component X. Direct Material Rs.3.00 Direct Labour 0.25 DLH @ Rs. 8 Rs.2.00 Manufacturing Overhead 0.25 Machine Hours @ Rs. 10 Rs.2.50 Total Rs.7.50 The company has been able to utilize only 80% of its capacity in the past and it does not expect a change in the situation in future. Required: Differential cost analysis to see whether the company should make its own component 'X' or not if company suppose to increased its capacity to produced X. Ans: Make save Rs. 2,88,000]
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started