Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

please complete the excel portion Total Cost of Production = Cost of Procedure 1(P1)+ Cost of Procedure 2 (P2) Total cost of Procodure 1 is

please complete the excel portion
image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
Total Cost of Production = Cost of Procedure 1(P1)+ Cost of Procedure 2 (P2) Total cost of Procodure 1 is twioe that of Procedure 2 : P1=2(P2) Substtute for P1 in the formula: =2(P2)+P2=3(P2)=P2P1=2(P2)=(2=)= Cost makeup of Procedure 1: Labor Materiais Overhead Total Cost makeup of Procedute 2 : Labor Materials Ovethead Total Materials cost of Procedute 1 Materiais cost = of P1, so P1 total cost = Procedure 1 cost fwice as much as Procedure 2, so P2 total cost = Cont makeus of Procedure 1: nosimenoup on riverumie : Obj. 2,4 Get Hitched Inc. is a production company that is in the process of testing a strategic initiative aimed at increasing gross profit. The company's current sales revenue is $1:5 million. Currently, the company's gross profit is 35% of sales, but the company's target gross profit percentage is 40%. The company's current monthly cost of production is $975,000. Of this cost, 60% is for labor, 30% is for materials, and 10% is for overhead. The strategic initiative being tested at Get Hitched is a redesign of its production process that splits the process into two sequential procedures. The makeup of the costs of production for Procedure 1 is currently 50% direct labor, 45% direct materials, and 5% overhead. The makeup of the costs of production for Procedure 2 is currently 55% direct labor, 25% direct materials, and 20% overhead. Company management estimates that Procedure 1 costs twice as much as Procedure 2. INSTRUCTIONS 1. Determine what the cost of labor, materials, and overhead for both Procedures 1 and 2 would need to be for the company to meet its target gross profit at the current level of sales. 2. The company's actual direct materials cost is $279,000 for Procedure 1. Determine the actual cost of direct labor, direct materials, and overhead for each procedure. and the total cost of production for each procedure. the actual cost of direct labor, direct materials, and overhead for each procedure, and the total cost of production for each procedure. Answer: Check Figure: Total cost of Procedure 2:$310,000 3. The company is planning a CSR initiative to reuse some of the indirect materials used in production during Procedure 2. These indirect materials normally make up 60% of the overhead cost for Procedure 2 , but the CSR initiative would reduce the usage of indirect materials. Determine what the maximum new cost of these indirect materials could be for Procedure 2 if this CSR initiative is expected to enable the company to meet its target gross profit percentage (holding all other costs constant)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

College Accounting Chapters 1-15

Authors: James Heintz

21st Edition

1285624815, 9781285624815

More Books

Students also viewed these Accounting questions

Question

3. Demonstrate how income inequality has changed since 1970.

Answered: 1 week ago