Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

please dont use excel Question 1 (CLOI 10 Marks) EcoHouse Sdn. Bhd. decides to build a jogging track around the new residential area. Their research

please dont use excel image text in transcribed
Question 1 (CLOI 10 Marks) EcoHouse Sdn. Bhd. decides to build a jogging track around the new residential area. Their research concluded to two options of constructions and designs. The first option will use asphalt with stone base. All components in Option 1 design have a 20-year life. This design requires stone-support costing $90 per foot; two paved ditches costing $3 per foot each and three squares of asphalt per mile that costs $9,000. Annual maintenance of this option will cost $1,800 per mile; the asphalts surface must be touched-up every five years at a cost of $450 each per mile. Option 2 involves polyurethane with concrete base. The concrete base costs $45 per foot, two sodded ditches costing $1.50 per foot each and three squares of polyurethane every mile that costs $2,250. All components in this design have a 10-year life. The replacement of polyurethane squares will cost $2,400 each. Annual maintenance will cost $2,700 per mile; the polyurethane surface must be touched-up yearly at a cost of $225 each per mile; and the annual ditch maintenance will cost $1.50 per foot per ditch. Using the annual worth (AW) analysis, recommend a more economical option on the basis of equivalent worth per mile for a 20-year period if the MARR is 6% per year. (Note: Assume surface touch-up also occurs at the end of the year 20) (10 marks) Question 1 (CLOI 10 Marks) EcoHouse Sdn. Bhd. decides to build a jogging track around the new residential area. Their research concluded to two options of constructions and designs. The first option will use asphalt with stone base. All components in Option 1 design have a 20-year life. This design requires stone-support costing $90 per foot; two paved ditches costing $3 per foot each and three squares of asphalt per mile that costs $9,000. Annual maintenance of this option will cost $1,800 per mile; the asphalts surface must be touched-up every five years at a cost of $450 each per mile. Option 2 involves polyurethane with concrete base. The concrete base costs $45 per foot, two sodded ditches costing $1.50 per foot each and three squares of polyurethane every mile that costs $2,250. All components in this design have a 10-year life. The replacement of polyurethane squares will cost $2,400 each. Annual maintenance will cost $2,700 per mile; the polyurethane surface must be touched-up yearly at a cost of $225 each per mile; and the annual ditch maintenance will cost $1.50 per foot per ditch. Using the annual worth (AW) analysis, recommend a more economical option on the basis of equivalent worth per mile for a 20-year period if the MARR is 6% per year. (Note: Assume surface touch-up also occurs at the end of the year 20) (10 marks)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Production And Operations Analytics

Authors: Steven Nahmias, Tava Lennon Olsen

8th Edition

1478639261, 9781478639268

More Books

Students also viewed these Finance questions