Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Please give good answers for both for a thumbs up! 6. A computer has 4 GB of RAM of which the operating system occupies 512

Please give good answers for both for a thumbs up!

image text in transcribed

6. A computer has 4 GB of RAM of which the operating system occupies 512 MB. The processes are all 256 MB (for simplicity) and have the same characteristics. If the goal is 99% CPU utilization, what is the maximum I/O wait that can be tolerated? 7. Multiple jobs can run in parallel and finish faster than if they had run sequentially Suppose that two jobs, each needing 20 minutes of CPU time, start simultaneously How long will the last one take to complete if they run sequentially? How long if they run in parallel? Assume 50% I/O wait 6. A computer has 4 GB of RAM of which the operating system occupies 512 MB. The processes are all 256 MB (for simplicity) and have the same characteristics. If the goal is 99% CPU utilization, what is the maximum I/O wait that can be tolerated? 7. Multiple jobs can run in parallel and finish faster than if they had run sequentially Suppose that two jobs, each needing 20 minutes of CPU time, start simultaneously How long will the last one take to complete if they run sequentially? How long if they run in parallel? Assume 50% I/O wait

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Business Process Driven Database Design With Oracle PL SQL

Authors: Rajeev Kaula

1st Edition

1795532386, 978-1795532389

More Books

Students also viewed these Databases questions